Beltzville Lake Lehigh River Basin, Pohopoco Creek, Pennsylvania. Condition Report. Dam, Outlet Works and Spillway Periodic Inspection Report Number 1, July 1970
The first periodical inspection of Beltzville Lake Dam, Pohopoco Creek, was undertaken by representatives of the Office of the Chief of Engineer, North Atlantic Division and the Philadelphia District. The overall condition of the dam was very good with no significant cracking on the outlet works and...
Other Authors: | |
---|---|
Format: | Text |
Language: | English |
Published: |
1971
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA081940 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA081940 |
id |
ftdtic:ADA081940 |
---|---|
record_format |
openpolar |
spelling |
ftdtic:ADA081940 2023-05-15T17:32:17+02:00 Beltzville Lake Lehigh River Basin, Pohopoco Creek, Pennsylvania. Condition Report. Dam, Outlet Works and Spillway Periodic Inspection Report Number 1, July 1970 ARMY ENGINEER DISTRICT PHILADELPHIA PA 1971-02 text/html http://www.dtic.mil/docs/citations/ADA081940 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA081940 en eng http://www.dtic.mil/docs/citations/ADA081940 Approved for public release; distribution is unlimited. Document partially illegible. DTIC AND NTIS Civil Engineering *STRUCTURAL ANALYSIS *EARTH DAMS DEFORMATION CONCRETE DEFECTS(MATERIALS) CONSTRUCTION MEASURING INSTRUMENTS INSPECTION EMBANKMENTS PENNSYLVANIA WATER EROSION *BELTZVILLE DAM DAM INSPECTION SPILLWAYS Text 1971 ftdtic 2016-02-22T15:03:36Z The first periodical inspection of Beltzville Lake Dam, Pohopoco Creek, was undertaken by representatives of the Office of the Chief of Engineer, North Atlantic Division and the Philadelphia District. The overall condition of the dam was very good with no significant cracking on the outlet works and no structural effects observed on the spillways although some of the weepholes in the spillway stabs were clogged with debris and required cleaning. Bridge movement was not observed and piezometers showed only minute and insignificant pressures. The inspection disclosed no serious problems but several minor deficiencies were noted in the embankment, particularly at contact with the abutments in the conduit and spillway. Repair measures were outlined to be undertaken to correct these deficiencies. Text North Atlantic Defense Technical Information Center: DTIC Technical Reports database |
institution |
Open Polar |
collection |
Defense Technical Information Center: DTIC Technical Reports database |
op_collection_id |
ftdtic |
language |
English |
topic |
Civil Engineering *STRUCTURAL ANALYSIS *EARTH DAMS DEFORMATION CONCRETE DEFECTS(MATERIALS) CONSTRUCTION MEASURING INSTRUMENTS INSPECTION EMBANKMENTS PENNSYLVANIA WATER EROSION *BELTZVILLE DAM DAM INSPECTION SPILLWAYS |
spellingShingle |
Civil Engineering *STRUCTURAL ANALYSIS *EARTH DAMS DEFORMATION CONCRETE DEFECTS(MATERIALS) CONSTRUCTION MEASURING INSTRUMENTS INSPECTION EMBANKMENTS PENNSYLVANIA WATER EROSION *BELTZVILLE DAM DAM INSPECTION SPILLWAYS Beltzville Lake Lehigh River Basin, Pohopoco Creek, Pennsylvania. Condition Report. Dam, Outlet Works and Spillway Periodic Inspection Report Number 1, July 1970 |
topic_facet |
Civil Engineering *STRUCTURAL ANALYSIS *EARTH DAMS DEFORMATION CONCRETE DEFECTS(MATERIALS) CONSTRUCTION MEASURING INSTRUMENTS INSPECTION EMBANKMENTS PENNSYLVANIA WATER EROSION *BELTZVILLE DAM DAM INSPECTION SPILLWAYS |
description |
The first periodical inspection of Beltzville Lake Dam, Pohopoco Creek, was undertaken by representatives of the Office of the Chief of Engineer, North Atlantic Division and the Philadelphia District. The overall condition of the dam was very good with no significant cracking on the outlet works and no structural effects observed on the spillways although some of the weepholes in the spillway stabs were clogged with debris and required cleaning. Bridge movement was not observed and piezometers showed only minute and insignificant pressures. The inspection disclosed no serious problems but several minor deficiencies were noted in the embankment, particularly at contact with the abutments in the conduit and spillway. Repair measures were outlined to be undertaken to correct these deficiencies. |
author2 |
ARMY ENGINEER DISTRICT PHILADELPHIA PA |
format |
Text |
title |
Beltzville Lake Lehigh River Basin, Pohopoco Creek, Pennsylvania. Condition Report. Dam, Outlet Works and Spillway Periodic Inspection Report Number 1, July 1970 |
title_short |
Beltzville Lake Lehigh River Basin, Pohopoco Creek, Pennsylvania. Condition Report. Dam, Outlet Works and Spillway Periodic Inspection Report Number 1, July 1970 |
title_full |
Beltzville Lake Lehigh River Basin, Pohopoco Creek, Pennsylvania. Condition Report. Dam, Outlet Works and Spillway Periodic Inspection Report Number 1, July 1970 |
title_fullStr |
Beltzville Lake Lehigh River Basin, Pohopoco Creek, Pennsylvania. Condition Report. Dam, Outlet Works and Spillway Periodic Inspection Report Number 1, July 1970 |
title_full_unstemmed |
Beltzville Lake Lehigh River Basin, Pohopoco Creek, Pennsylvania. Condition Report. Dam, Outlet Works and Spillway Periodic Inspection Report Number 1, July 1970 |
title_sort |
beltzville lake lehigh river basin, pohopoco creek, pennsylvania. condition report. dam, outlet works and spillway periodic inspection report number 1, july 1970 |
publishDate |
1971 |
url |
http://www.dtic.mil/docs/citations/ADA081940 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA081940 |
genre |
North Atlantic |
genre_facet |
North Atlantic |
op_source |
DTIC AND NTIS |
op_relation |
http://www.dtic.mil/docs/citations/ADA081940 |
op_rights |
Approved for public release; distribution is unlimited. Document partially illegible. |
_version_ |
1766130317151698944 |