National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report.

The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping,...

Full description

Bibliographic Details
Main Author: Roberts,Thomas E
Other Authors: GILBERT ASSOCIATES INC READING PA
Format: Text
Language:English
Published: 1978
Subjects:
Online Access:http://www.dtic.mil/docs/citations/ADA063637
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA063637
id ftdtic:ADA063637
record_format openpolar
spelling ftdtic:ADA063637 2023-05-15T15:41:03+02:00 National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report. Roberts,Thomas E GILBERT ASSOCIATES INC READING PA 1978-09 text/html http://www.dtic.mil/docs/citations/ADA063637 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA063637 en eng http://www.dtic.mil/docs/citations/ADA063637 Availability: Document partially illegible. DTIC AND NTIS Civil Engineering *STRUCTURAL ANALYSIS *INSPECTION *EARTH DAMS MAINTENANCE VIRGINIA HYDROLOGY GEOLOGY SAFETY VISUAL INSPECTION RESERVOIRS WATER SUPPLIES FLOOD CONTROL *National Dam Safety Program *Beaver Creek Dam Spillways Text 1978 ftdtic 2016-02-20T15:26:21Z The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonable accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures. Text Beaver Creek Defense Technical Information Center: DTIC Technical Reports database
institution Open Polar
collection Defense Technical Information Center: DTIC Technical Reports database
op_collection_id ftdtic
language English
topic Civil Engineering
*STRUCTURAL ANALYSIS
*INSPECTION
*EARTH DAMS
MAINTENANCE
VIRGINIA
HYDROLOGY
GEOLOGY
SAFETY
VISUAL INSPECTION
RESERVOIRS
WATER SUPPLIES
FLOOD CONTROL
*National Dam Safety Program
*Beaver Creek Dam
Spillways
spellingShingle Civil Engineering
*STRUCTURAL ANALYSIS
*INSPECTION
*EARTH DAMS
MAINTENANCE
VIRGINIA
HYDROLOGY
GEOLOGY
SAFETY
VISUAL INSPECTION
RESERVOIRS
WATER SUPPLIES
FLOOD CONTROL
*National Dam Safety Program
*Beaver Creek Dam
Spillways
Roberts,Thomas E
National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report.
topic_facet Civil Engineering
*STRUCTURAL ANALYSIS
*INSPECTION
*EARTH DAMS
MAINTENANCE
VIRGINIA
HYDROLOGY
GEOLOGY
SAFETY
VISUAL INSPECTION
RESERVOIRS
WATER SUPPLIES
FLOOD CONTROL
*National Dam Safety Program
*Beaver Creek Dam
Spillways
description The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonable accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.
author2 GILBERT ASSOCIATES INC READING PA
format Text
author Roberts,Thomas E
author_facet Roberts,Thomas E
author_sort Roberts,Thomas E
title National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report.
title_short National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report.
title_full National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report.
title_fullStr National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report.
title_full_unstemmed National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report.
title_sort national dam safety program. beaver creek dam (va 08903), roanoke river basin, martinsville, virginia. phase i inspection report.
publishDate 1978
url http://www.dtic.mil/docs/citations/ADA063637
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA063637
genre Beaver Creek
genre_facet Beaver Creek
op_source DTIC AND NTIS
op_relation http://www.dtic.mil/docs/citations/ADA063637
op_rights Availability: Document partially illegible.
_version_ 1766373913017712640