National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report.
The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping,...
Main Author: | |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1978
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA063637 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA063637 |
id |
ftdtic:ADA063637 |
---|---|
record_format |
openpolar |
spelling |
ftdtic:ADA063637 2023-05-15T15:41:03+02:00 National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report. Roberts,Thomas E GILBERT ASSOCIATES INC READING PA 1978-09 text/html http://www.dtic.mil/docs/citations/ADA063637 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA063637 en eng http://www.dtic.mil/docs/citations/ADA063637 Availability: Document partially illegible. DTIC AND NTIS Civil Engineering *STRUCTURAL ANALYSIS *INSPECTION *EARTH DAMS MAINTENANCE VIRGINIA HYDROLOGY GEOLOGY SAFETY VISUAL INSPECTION RESERVOIRS WATER SUPPLIES FLOOD CONTROL *National Dam Safety Program *Beaver Creek Dam Spillways Text 1978 ftdtic 2016-02-20T15:26:21Z The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonable accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures. Text Beaver Creek Defense Technical Information Center: DTIC Technical Reports database |
institution |
Open Polar |
collection |
Defense Technical Information Center: DTIC Technical Reports database |
op_collection_id |
ftdtic |
language |
English |
topic |
Civil Engineering *STRUCTURAL ANALYSIS *INSPECTION *EARTH DAMS MAINTENANCE VIRGINIA HYDROLOGY GEOLOGY SAFETY VISUAL INSPECTION RESERVOIRS WATER SUPPLIES FLOOD CONTROL *National Dam Safety Program *Beaver Creek Dam Spillways |
spellingShingle |
Civil Engineering *STRUCTURAL ANALYSIS *INSPECTION *EARTH DAMS MAINTENANCE VIRGINIA HYDROLOGY GEOLOGY SAFETY VISUAL INSPECTION RESERVOIRS WATER SUPPLIES FLOOD CONTROL *National Dam Safety Program *Beaver Creek Dam Spillways Roberts,Thomas E National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report. |
topic_facet |
Civil Engineering *STRUCTURAL ANALYSIS *INSPECTION *EARTH DAMS MAINTENANCE VIRGINIA HYDROLOGY GEOLOGY SAFETY VISUAL INSPECTION RESERVOIRS WATER SUPPLIES FLOOD CONTROL *National Dam Safety Program *Beaver Creek Dam Spillways |
description |
The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonable accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures. |
author2 |
GILBERT ASSOCIATES INC READING PA |
format |
Text |
author |
Roberts,Thomas E |
author_facet |
Roberts,Thomas E |
author_sort |
Roberts,Thomas E |
title |
National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report. |
title_short |
National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report. |
title_full |
National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report. |
title_fullStr |
National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report. |
title_full_unstemmed |
National Dam Safety Program. Beaver Creek Dam (VA 08903), Roanoke River Basin, Martinsville, Virginia. Phase I Inspection Report. |
title_sort |
national dam safety program. beaver creek dam (va 08903), roanoke river basin, martinsville, virginia. phase i inspection report. |
publishDate |
1978 |
url |
http://www.dtic.mil/docs/citations/ADA063637 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA063637 |
genre |
Beaver Creek |
genre_facet |
Beaver Creek |
op_source |
DTIC AND NTIS |
op_relation |
http://www.dtic.mil/docs/citations/ADA063637 |
op_rights |
Availability: Document partially illegible. |
_version_ |
1766373913017712640 |