Construction and Operation of Low-Pressure Dams on Permafrost Soils (Opyt Stroitelstva i Ekspluatatsii Nizkonapornykh Plotin na Vechnomerzlykh Gruntakh)
During the construction and operation of frozen dams, just as for the construction of dams by the thaw method, but for their operation as such, frozen soils may be used for the foundation. However, the foundation soils must not be allowed to thaw. Filtration through the body and foundation of a dam...
Main Author: | |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1977
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA041253 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA041253 |
id |
ftdtic:ADA041253 |
---|---|
record_format |
openpolar |
spelling |
ftdtic:ADA041253 2023-05-15T14:53:56+02:00 Construction and Operation of Low-Pressure Dams on Permafrost Soils (Opyt Stroitelstva i Ekspluatatsii Nizkonapornykh Plotin na Vechnomerzlykh Gruntakh) Biyanov,G F COLD REGIONS RESEARCH AND ENGINEERING LAB HANOVER N H 1977-07 text/html http://www.dtic.mil/docs/citations/ADA041253 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA041253 en eng http://www.dtic.mil/docs/citations/ADA041253 APPROVED FOR PUBLIC RELEASE DTIC AND NTIS Civil Engineering *DAMS USSR LOW PRESSURE SOILS CONSTRUCTION CONFIGURATIONS OPERATION TRANSLATIONS FOUNDATIONS(STRUCTURES) ARCTIC REGIONS PERMAFROST Arctic construction Text 1977 ftdtic 2016-02-20T13:56:51Z During the construction and operation of frozen dams, just as for the construction of dams by the thaw method, but for their operation as such, frozen soils may be used for the foundation. However, the foundation soils must not be allowed to thaw. Filtration through the body and foundation of a dam should be completely precluded. Otherwise losses of the filtration resistance and overall strength of the facility will occur. The requirement of ensuring against filtration through the body and foundation of a dam or in the bank (one word illegible) and its abutment with the spillway must also be observed during the construction of dams by the thaw method. Trans. of Trudy IV Soveshchaniya-Seminara po Obmenu Opytom Stroitelstva v Surovykh Klimaticheskikh Usloviyakh (USSR) v10 33p 1966. Text Arctic permafrost Defense Technical Information Center: DTIC Technical Reports database Arctic Opyt ENVELOPE(152.767,152.767,64.083,64.083) |
institution |
Open Polar |
collection |
Defense Technical Information Center: DTIC Technical Reports database |
op_collection_id |
ftdtic |
language |
English |
topic |
Civil Engineering *DAMS USSR LOW PRESSURE SOILS CONSTRUCTION CONFIGURATIONS OPERATION TRANSLATIONS FOUNDATIONS(STRUCTURES) ARCTIC REGIONS PERMAFROST Arctic construction |
spellingShingle |
Civil Engineering *DAMS USSR LOW PRESSURE SOILS CONSTRUCTION CONFIGURATIONS OPERATION TRANSLATIONS FOUNDATIONS(STRUCTURES) ARCTIC REGIONS PERMAFROST Arctic construction Biyanov,G F Construction and Operation of Low-Pressure Dams on Permafrost Soils (Opyt Stroitelstva i Ekspluatatsii Nizkonapornykh Plotin na Vechnomerzlykh Gruntakh) |
topic_facet |
Civil Engineering *DAMS USSR LOW PRESSURE SOILS CONSTRUCTION CONFIGURATIONS OPERATION TRANSLATIONS FOUNDATIONS(STRUCTURES) ARCTIC REGIONS PERMAFROST Arctic construction |
description |
During the construction and operation of frozen dams, just as for the construction of dams by the thaw method, but for their operation as such, frozen soils may be used for the foundation. However, the foundation soils must not be allowed to thaw. Filtration through the body and foundation of a dam should be completely precluded. Otherwise losses of the filtration resistance and overall strength of the facility will occur. The requirement of ensuring against filtration through the body and foundation of a dam or in the bank (one word illegible) and its abutment with the spillway must also be observed during the construction of dams by the thaw method. Trans. of Trudy IV Soveshchaniya-Seminara po Obmenu Opytom Stroitelstva v Surovykh Klimaticheskikh Usloviyakh (USSR) v10 33p 1966. |
author2 |
COLD REGIONS RESEARCH AND ENGINEERING LAB HANOVER N H |
format |
Text |
author |
Biyanov,G F |
author_facet |
Biyanov,G F |
author_sort |
Biyanov,G F |
title |
Construction and Operation of Low-Pressure Dams on Permafrost Soils (Opyt Stroitelstva i Ekspluatatsii Nizkonapornykh Plotin na Vechnomerzlykh Gruntakh) |
title_short |
Construction and Operation of Low-Pressure Dams on Permafrost Soils (Opyt Stroitelstva i Ekspluatatsii Nizkonapornykh Plotin na Vechnomerzlykh Gruntakh) |
title_full |
Construction and Operation of Low-Pressure Dams on Permafrost Soils (Opyt Stroitelstva i Ekspluatatsii Nizkonapornykh Plotin na Vechnomerzlykh Gruntakh) |
title_fullStr |
Construction and Operation of Low-Pressure Dams on Permafrost Soils (Opyt Stroitelstva i Ekspluatatsii Nizkonapornykh Plotin na Vechnomerzlykh Gruntakh) |
title_full_unstemmed |
Construction and Operation of Low-Pressure Dams on Permafrost Soils (Opyt Stroitelstva i Ekspluatatsii Nizkonapornykh Plotin na Vechnomerzlykh Gruntakh) |
title_sort |
construction and operation of low-pressure dams on permafrost soils (opyt stroitelstva i ekspluatatsii nizkonapornykh plotin na vechnomerzlykh gruntakh) |
publishDate |
1977 |
url |
http://www.dtic.mil/docs/citations/ADA041253 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA041253 |
long_lat |
ENVELOPE(152.767,152.767,64.083,64.083) |
geographic |
Arctic Opyt |
geographic_facet |
Arctic Opyt |
genre |
Arctic permafrost |
genre_facet |
Arctic permafrost |
op_source |
DTIC AND NTIS |
op_relation |
http://www.dtic.mil/docs/citations/ADA041253 |
op_rights |
APPROVED FOR PUBLIC RELEASE |
_version_ |
1766325628047458304 |