Semiannual Report, Project T/4703, Special Data Collection Systems, January through June 1976

Five SDCS systems which had been deployed in early 1975 continued routine operations throughout the report period. Sites at Red Lake, Ontario, and Whitehorse Yukon, are standard SDCS units; the site at Cumberland Plateau Observatory in Tennessee uses that station's SP array as its SP input. The...

Full description

Bibliographic Details
Main Author: Sherwin, John R
Other Authors: TELEDYNE GEOTECH GARLAND TX
Format: Text
Language:English
Published: 1976
Subjects:
Online Access:http://www.dtic.mil/docs/citations/ADA035270
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA035270
id ftdtic:ADA035270
record_format openpolar
spelling ftdtic:ADA035270 2023-05-15T18:44:11+02:00 Semiannual Report, Project T/4703, Special Data Collection Systems, January through June 1976 Sherwin, John R TELEDYNE GEOTECH GARLAND TX 1976-07-30 text/html http://www.dtic.mil/docs/citations/ADA035270 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA035270 en eng http://www.dtic.mil/docs/citations/ADA035270 Approved for public release; distribution is unlimited. DTIC AND NTIS Seismic Detection and Detectors *SEISMIC ARRAYS *SEISMIC DETECTION BOREHOLES DATA ACQUISITION DATA PROCESSING DIGITAL RECORDING SYSTEMS *VELA UNIFORM Text 1976 ftdtic 2016-02-23T09:46:57Z Five SDCS systems which had been deployed in early 1975 continued routine operations throughout the report period. Sites at Red Lake, Ontario, and Whitehorse Yukon, are standard SDCS units; the site at Cumberland Plateau Observatory in Tennessee uses that station's SP array as its SP input. The Franklin, West Virginia, and Houlton, Maine sites use a Model 36000 Borehole Seismometer System. The five stations have routinely collected seismic data on a continuous basis throughout this period. Data analysis tasks for the program are being done at the SDAC in Alexandria, Virginia. During the period, 33 requests for event reports were received and all but 4 had been completed by the end of the period. In addition, a backlog of about 20 reports from the previous period was completed. The last two of five digital data acquisition systems were installed during this period and operation of these systems has been incorporated into the normal SDCS routine with minimum difficulty. ARPA ORDER-2897 Text Whitehorse Yukon Defense Technical Information Center: DTIC Technical Reports database Red Lake ENVELOPE(-113.118,-113.118,63.267,63.267) Yukon
institution Open Polar
collection Defense Technical Information Center: DTIC Technical Reports database
op_collection_id ftdtic
language English
topic Seismic Detection and Detectors
*SEISMIC ARRAYS
*SEISMIC DETECTION
BOREHOLES
DATA ACQUISITION
DATA PROCESSING
DIGITAL RECORDING SYSTEMS
*VELA UNIFORM
spellingShingle Seismic Detection and Detectors
*SEISMIC ARRAYS
*SEISMIC DETECTION
BOREHOLES
DATA ACQUISITION
DATA PROCESSING
DIGITAL RECORDING SYSTEMS
*VELA UNIFORM
Sherwin, John R
Semiannual Report, Project T/4703, Special Data Collection Systems, January through June 1976
topic_facet Seismic Detection and Detectors
*SEISMIC ARRAYS
*SEISMIC DETECTION
BOREHOLES
DATA ACQUISITION
DATA PROCESSING
DIGITAL RECORDING SYSTEMS
*VELA UNIFORM
description Five SDCS systems which had been deployed in early 1975 continued routine operations throughout the report period. Sites at Red Lake, Ontario, and Whitehorse Yukon, are standard SDCS units; the site at Cumberland Plateau Observatory in Tennessee uses that station's SP array as its SP input. The Franklin, West Virginia, and Houlton, Maine sites use a Model 36000 Borehole Seismometer System. The five stations have routinely collected seismic data on a continuous basis throughout this period. Data analysis tasks for the program are being done at the SDAC in Alexandria, Virginia. During the period, 33 requests for event reports were received and all but 4 had been completed by the end of the period. In addition, a backlog of about 20 reports from the previous period was completed. The last two of five digital data acquisition systems were installed during this period and operation of these systems has been incorporated into the normal SDCS routine with minimum difficulty. ARPA ORDER-2897
author2 TELEDYNE GEOTECH GARLAND TX
format Text
author Sherwin, John R
author_facet Sherwin, John R
author_sort Sherwin, John R
title Semiannual Report, Project T/4703, Special Data Collection Systems, January through June 1976
title_short Semiannual Report, Project T/4703, Special Data Collection Systems, January through June 1976
title_full Semiannual Report, Project T/4703, Special Data Collection Systems, January through June 1976
title_fullStr Semiannual Report, Project T/4703, Special Data Collection Systems, January through June 1976
title_full_unstemmed Semiannual Report, Project T/4703, Special Data Collection Systems, January through June 1976
title_sort semiannual report, project t/4703, special data collection systems, january through june 1976
publishDate 1976
url http://www.dtic.mil/docs/citations/ADA035270
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA035270
long_lat ENVELOPE(-113.118,-113.118,63.267,63.267)
geographic Red Lake
Yukon
geographic_facet Red Lake
Yukon
genre Whitehorse
Yukon
genre_facet Whitehorse
Yukon
op_source DTIC AND NTIS
op_relation http://www.dtic.mil/docs/citations/ADA035270
op_rights Approved for public release; distribution is unlimited.
_version_ 1766234769738170368