Semi-Annual Report, Project T/4703 Special Data Collection Systems July through December 1975
The work performed under Project T4703, Special Data Collection Systems, during the period from 1 July through 31 December 1975 is described. Five SDCS systems which had been deployed in early 1975 continued routine operations throughout the report period. Sites at Red Lake, Ontario, and Whitehorse,...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1976
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA028203 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA028203 |
id |
ftdtic:ADA028203 |
---|---|
record_format |
openpolar |
spelling |
ftdtic:ADA028203 2023-05-15T18:44:11+02:00 Semi-Annual Report, Project T/4703 Special Data Collection Systems July through December 1975 Sherwin, John R Kraus, George C TELEDYNE GEOTECH GARLAND TX 1976-03-30 text/html http://www.dtic.mil/docs/citations/ADA028203 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA028203 en eng http://www.dtic.mil/docs/citations/ADA028203 Approved for public release; distribution is unlimited. DTIC AND NTIS Seismic Detection and Detectors *SEISMIC DATA *SEISMIC DETECTION *UNDERGROUND EXPLOSIONS DATA PROCESSING IDENTIFICATION SYSTEMS POSITION(LOCATION) SEISMIC SIGNATURES SEISMOGRAPHS Text 1976 ftdtic 2016-02-24T11:28:10Z The work performed under Project T4703, Special Data Collection Systems, during the period from 1 July through 31 December 1975 is described. Five SDCS systems which had been deployed in early 1975 continued routine operations throughout the report period. Sites at Red Lake, Ontario, and Whitehorse, Yukon, the standard SDC units; the site at Cumberland Plateau Observatory in Tennessee uses that station's SP array as its SP input. The Franklin, West Virginia, site uses a Model 36000 Borehole Seismometer System; the Houlton, Maine, site was a standard SDCS system until 11 December when a Model 36000 system was placed into operation. The five stations have routinely collected seismic data on a continuous basis throughout this period. Data analysis tasks for the program are being done at the SDAC in Alexandria, Virginia. During the period 29 requests for event reports were received, or a total of 75 requests since March, and at the end of the period, 53 reports had been completed. Text Whitehorse Yukon Defense Technical Information Center: DTIC Technical Reports database Red Lake ENVELOPE(-113.118,-113.118,63.267,63.267) Yukon |
institution |
Open Polar |
collection |
Defense Technical Information Center: DTIC Technical Reports database |
op_collection_id |
ftdtic |
language |
English |
topic |
Seismic Detection and Detectors *SEISMIC DATA *SEISMIC DETECTION *UNDERGROUND EXPLOSIONS DATA PROCESSING IDENTIFICATION SYSTEMS POSITION(LOCATION) SEISMIC SIGNATURES SEISMOGRAPHS |
spellingShingle |
Seismic Detection and Detectors *SEISMIC DATA *SEISMIC DETECTION *UNDERGROUND EXPLOSIONS DATA PROCESSING IDENTIFICATION SYSTEMS POSITION(LOCATION) SEISMIC SIGNATURES SEISMOGRAPHS Sherwin, John R Kraus, George C Semi-Annual Report, Project T/4703 Special Data Collection Systems July through December 1975 |
topic_facet |
Seismic Detection and Detectors *SEISMIC DATA *SEISMIC DETECTION *UNDERGROUND EXPLOSIONS DATA PROCESSING IDENTIFICATION SYSTEMS POSITION(LOCATION) SEISMIC SIGNATURES SEISMOGRAPHS |
description |
The work performed under Project T4703, Special Data Collection Systems, during the period from 1 July through 31 December 1975 is described. Five SDCS systems which had been deployed in early 1975 continued routine operations throughout the report period. Sites at Red Lake, Ontario, and Whitehorse, Yukon, the standard SDC units; the site at Cumberland Plateau Observatory in Tennessee uses that station's SP array as its SP input. The Franklin, West Virginia, site uses a Model 36000 Borehole Seismometer System; the Houlton, Maine, site was a standard SDCS system until 11 December when a Model 36000 system was placed into operation. The five stations have routinely collected seismic data on a continuous basis throughout this period. Data analysis tasks for the program are being done at the SDAC in Alexandria, Virginia. During the period 29 requests for event reports were received, or a total of 75 requests since March, and at the end of the period, 53 reports had been completed. |
author2 |
TELEDYNE GEOTECH GARLAND TX |
format |
Text |
author |
Sherwin, John R Kraus, George C |
author_facet |
Sherwin, John R Kraus, George C |
author_sort |
Sherwin, John R |
title |
Semi-Annual Report, Project T/4703 Special Data Collection Systems July through December 1975 |
title_short |
Semi-Annual Report, Project T/4703 Special Data Collection Systems July through December 1975 |
title_full |
Semi-Annual Report, Project T/4703 Special Data Collection Systems July through December 1975 |
title_fullStr |
Semi-Annual Report, Project T/4703 Special Data Collection Systems July through December 1975 |
title_full_unstemmed |
Semi-Annual Report, Project T/4703 Special Data Collection Systems July through December 1975 |
title_sort |
semi-annual report, project t/4703 special data collection systems july through december 1975 |
publishDate |
1976 |
url |
http://www.dtic.mil/docs/citations/ADA028203 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA028203 |
long_lat |
ENVELOPE(-113.118,-113.118,63.267,63.267) |
geographic |
Red Lake Yukon |
geographic_facet |
Red Lake Yukon |
genre |
Whitehorse Yukon |
genre_facet |
Whitehorse Yukon |
op_source |
DTIC AND NTIS |
op_relation |
http://www.dtic.mil/docs/citations/ADA028203 |
op_rights |
Approved for public release; distribution is unlimited. |
_version_ |
1766234770594856960 |