Check Test of Mast AB-952/GRC-103 under Arctic Winter Conditions.

A check test of the Mast AB-952 was conducted by the ArctiC Test Center under arctic winter conditions at Ft. Greely, AK, from 30 Oct 73 to 21 Mar 74. Functional testing was conducted in temperatures ranging from -5 F to - 51 F. Preoperational inspection, personnel training, functional adequacy, mai...

Full description

Bibliographic Details
Main Author: Barnes, John W., Jr
Other Authors: ARMY ARCTIC TEST CENTER FORT GREELY AK
Format: Text
Language:English
Published: 1974
Subjects:
Online Access:http://www.dtic.mil/docs/citations/AD0919950
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0919950
id ftdtic:AD0919950
record_format openpolar
spelling ftdtic:AD0919950 2023-05-15T14:42:11+02:00 Check Test of Mast AB-952/GRC-103 under Arctic Winter Conditions. Barnes, John W., Jr ARMY ARCTIC TEST CENTER FORT GREELY AK 1974-05-03 text/html http://www.dtic.mil/docs/citations/AD0919950 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0919950 en eng http://www.dtic.mil/docs/citations/AD0919950 Document partially illegible. DTIC AND NTIS Structural Engineering and Building Technology Radio Communications *ANTENNA MASTS ACCEPTANCE TESTS PORTABLE EQUIPMENT HUMAN FACTORS ENGINEERING MAINTAINABILITY SAFETY EXTENDABLE STRUCTURES RADIO REPEATERS COMMUNICATION TERMINALS RADIO EQUIPMENT VALUE ENGINEERING ARCTIC REGIONS COLD WEATHER TESTS AB-952 masts AN/GRC-103 AN/TRC-113 AN/TRC-145 AN/TRC-127. Text 1974 ftdtic 2016-02-22T14:09:48Z A check test of the Mast AB-952 was conducted by the ArctiC Test Center under arctic winter conditions at Ft. Greely, AK, from 30 Oct 73 to 21 Mar 74. Functional testing was conducted in temperatures ranging from -5 F to - 51 F. Preoperational inspection, personnel training, functional adequacy, maintenance evaluation, safety, human factors, and value engineering subtests were conducted. The purpose of the test was to determine if the previously reported deficiency and shortcoming had been corrected and to insure no new deficiencies had been introduced by the mofications. It was concluded that the Mast AB-952 functioned as required down to -51F and that the deficiency and shortcoming had been eliminated. (Author) Text Arctic Defense Technical Information Center: DTIC Technical Reports database Arctic
institution Open Polar
collection Defense Technical Information Center: DTIC Technical Reports database
op_collection_id ftdtic
language English
topic Structural Engineering and Building Technology
Radio Communications
*ANTENNA MASTS
ACCEPTANCE TESTS
PORTABLE EQUIPMENT
HUMAN FACTORS ENGINEERING
MAINTAINABILITY
SAFETY
EXTENDABLE STRUCTURES
RADIO REPEATERS
COMMUNICATION TERMINALS
RADIO EQUIPMENT
VALUE ENGINEERING
ARCTIC REGIONS
COLD WEATHER TESTS
AB-952 masts
AN/GRC-103
AN/TRC-113
AN/TRC-145
AN/TRC-127.
spellingShingle Structural Engineering and Building Technology
Radio Communications
*ANTENNA MASTS
ACCEPTANCE TESTS
PORTABLE EQUIPMENT
HUMAN FACTORS ENGINEERING
MAINTAINABILITY
SAFETY
EXTENDABLE STRUCTURES
RADIO REPEATERS
COMMUNICATION TERMINALS
RADIO EQUIPMENT
VALUE ENGINEERING
ARCTIC REGIONS
COLD WEATHER TESTS
AB-952 masts
AN/GRC-103
AN/TRC-113
AN/TRC-145
AN/TRC-127.
Barnes, John W., Jr
Check Test of Mast AB-952/GRC-103 under Arctic Winter Conditions.
topic_facet Structural Engineering and Building Technology
Radio Communications
*ANTENNA MASTS
ACCEPTANCE TESTS
PORTABLE EQUIPMENT
HUMAN FACTORS ENGINEERING
MAINTAINABILITY
SAFETY
EXTENDABLE STRUCTURES
RADIO REPEATERS
COMMUNICATION TERMINALS
RADIO EQUIPMENT
VALUE ENGINEERING
ARCTIC REGIONS
COLD WEATHER TESTS
AB-952 masts
AN/GRC-103
AN/TRC-113
AN/TRC-145
AN/TRC-127.
description A check test of the Mast AB-952 was conducted by the ArctiC Test Center under arctic winter conditions at Ft. Greely, AK, from 30 Oct 73 to 21 Mar 74. Functional testing was conducted in temperatures ranging from -5 F to - 51 F. Preoperational inspection, personnel training, functional adequacy, maintenance evaluation, safety, human factors, and value engineering subtests were conducted. The purpose of the test was to determine if the previously reported deficiency and shortcoming had been corrected and to insure no new deficiencies had been introduced by the mofications. It was concluded that the Mast AB-952 functioned as required down to -51F and that the deficiency and shortcoming had been eliminated. (Author)
author2 ARMY ARCTIC TEST CENTER FORT GREELY AK
format Text
author Barnes, John W., Jr
author_facet Barnes, John W., Jr
author_sort Barnes, John W., Jr
title Check Test of Mast AB-952/GRC-103 under Arctic Winter Conditions.
title_short Check Test of Mast AB-952/GRC-103 under Arctic Winter Conditions.
title_full Check Test of Mast AB-952/GRC-103 under Arctic Winter Conditions.
title_fullStr Check Test of Mast AB-952/GRC-103 under Arctic Winter Conditions.
title_full_unstemmed Check Test of Mast AB-952/GRC-103 under Arctic Winter Conditions.
title_sort check test of mast ab-952/grc-103 under arctic winter conditions.
publishDate 1974
url http://www.dtic.mil/docs/citations/AD0919950
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0919950
geographic Arctic
geographic_facet Arctic
genre Arctic
genre_facet Arctic
op_source DTIC AND NTIS
op_relation http://www.dtic.mil/docs/citations/AD0919950
op_rights Document partially illegible.
_version_ 1766313882775715840