PIONEER POLAR STRUCTURES - SKID-FOUNDATION STUDY FOR A 64-FOOT JAMESWAY.
Frequent relocation of polar camps at outlying work centers and construction projects on snow and ice is necessary because of changing requirements, drifting snow and site contamination. Disassembly and re-erection of buildings during these moves is laborious and time consuming. In order to simplify...
Main Author: | |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1965
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/AD0465266 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0465266 |
id |
ftdtic:AD0465266 |
---|---|
record_format |
openpolar |
spelling |
ftdtic:AD0465266 2023-05-15T13:51:46+02:00 PIONEER POLAR STRUCTURES - SKID-FOUNDATION STUDY FOR A 64-FOOT JAMESWAY. Sherwood, Gerald E. NAVAL CIVIL ENGINEERING LAB PORT HUENEME CA 1965-06 text/html http://www.dtic.mil/docs/citations/AD0465266 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0465266 en eng http://www.dtic.mil/docs/citations/AD0465266 APPROVED FOR PUBLIC RELEASE DTIC AND NTIS *BUILDINGS POLAR REGIONS CONSTRUCTION MOBILE ENVIRONMENTAL TESTS TOWED BODIES JAMESWAY BUILDINGS Text 1965 ftdtic 2016-02-21T20:37:11Z Frequent relocation of polar camps at outlying work centers and construction projects on snow and ice is necessary because of changing requirements, drifting snow and site contamination. Disassembly and re-erection of buildings during these moves is laborious and time consuming. In order to simplify the movement of these camps, a skid foundation for Jamesways up to 64 feet long is being developed. An experimental, 64foot-long, rigid steel foundation was tested on a fairly hard snow area near McMurdo, Antarctica, in February 1965. During the tests, the foundation was high-centered over a hard ridge of snow and the cantilever action caused it to separate at the midpoint. It is now being redesigned to provide a hinge-joint at the center thus eliminating the bending moment. Test and evaluation of the hinged foundation are planned during the summer season of Deep Freeze 66. (Author) Text Antarc* Antarctica Defense Technical Information Center: DTIC Technical Reports database |
institution |
Open Polar |
collection |
Defense Technical Information Center: DTIC Technical Reports database |
op_collection_id |
ftdtic |
language |
English |
topic |
*BUILDINGS POLAR REGIONS CONSTRUCTION MOBILE ENVIRONMENTAL TESTS TOWED BODIES JAMESWAY BUILDINGS |
spellingShingle |
*BUILDINGS POLAR REGIONS CONSTRUCTION MOBILE ENVIRONMENTAL TESTS TOWED BODIES JAMESWAY BUILDINGS Sherwood, Gerald E. PIONEER POLAR STRUCTURES - SKID-FOUNDATION STUDY FOR A 64-FOOT JAMESWAY. |
topic_facet |
*BUILDINGS POLAR REGIONS CONSTRUCTION MOBILE ENVIRONMENTAL TESTS TOWED BODIES JAMESWAY BUILDINGS |
description |
Frequent relocation of polar camps at outlying work centers and construction projects on snow and ice is necessary because of changing requirements, drifting snow and site contamination. Disassembly and re-erection of buildings during these moves is laborious and time consuming. In order to simplify the movement of these camps, a skid foundation for Jamesways up to 64 feet long is being developed. An experimental, 64foot-long, rigid steel foundation was tested on a fairly hard snow area near McMurdo, Antarctica, in February 1965. During the tests, the foundation was high-centered over a hard ridge of snow and the cantilever action caused it to separate at the midpoint. It is now being redesigned to provide a hinge-joint at the center thus eliminating the bending moment. Test and evaluation of the hinged foundation are planned during the summer season of Deep Freeze 66. (Author) |
author2 |
NAVAL CIVIL ENGINEERING LAB PORT HUENEME CA |
format |
Text |
author |
Sherwood, Gerald E. |
author_facet |
Sherwood, Gerald E. |
author_sort |
Sherwood, Gerald E. |
title |
PIONEER POLAR STRUCTURES - SKID-FOUNDATION STUDY FOR A 64-FOOT JAMESWAY. |
title_short |
PIONEER POLAR STRUCTURES - SKID-FOUNDATION STUDY FOR A 64-FOOT JAMESWAY. |
title_full |
PIONEER POLAR STRUCTURES - SKID-FOUNDATION STUDY FOR A 64-FOOT JAMESWAY. |
title_fullStr |
PIONEER POLAR STRUCTURES - SKID-FOUNDATION STUDY FOR A 64-FOOT JAMESWAY. |
title_full_unstemmed |
PIONEER POLAR STRUCTURES - SKID-FOUNDATION STUDY FOR A 64-FOOT JAMESWAY. |
title_sort |
pioneer polar structures - skid-foundation study for a 64-foot jamesway. |
publishDate |
1965 |
url |
http://www.dtic.mil/docs/citations/AD0465266 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=AD0465266 |
genre |
Antarc* Antarctica |
genre_facet |
Antarc* Antarctica |
op_source |
DTIC AND NTIS |
op_relation |
http://www.dtic.mil/docs/citations/AD0465266 |
op_rights |
APPROVED FOR PUBLIC RELEASE |
_version_ |
1766255791117959168 |