Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis
A quantitative Kano model is used in this study to identify which features are preferred by top-level maintenance engineers within Icelandic geothermal power plants to be implemented in a maintenance tool or software. Visits were conducted to the largest Icelandic energy companies operating geotherm...
Published in: | Energies |
---|---|
Main Authors: | , , |
Format: | Article in Journal/Newspaper |
Language: | English |
Published: |
MDPI AG
2014
|
Subjects: | |
Online Access: | https://doi.org/10.3390/en7074169 https://doaj.org/article/95a96ebbca4a47c58c96908821c9802c |
id |
ftdoajarticles:oai:doaj.org/article:95a96ebbca4a47c58c96908821c9802c |
---|---|
record_format |
openpolar |
spelling |
ftdoajarticles:oai:doaj.org/article:95a96ebbca4a47c58c96908821c9802c 2023-05-15T16:49:15+02:00 Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis Reynir S. Atlason Gudmundur V. Oddsson Runar Unnthorsson 2014-07-01T00:00:00Z https://doi.org/10.3390/en7074169 https://doaj.org/article/95a96ebbca4a47c58c96908821c9802c EN eng MDPI AG http://www.mdpi.com/1996-1073/7/7/4169 https://doaj.org/toc/1996-1073 1996-1073 doi:10.3390/en7074169 https://doaj.org/article/95a96ebbca4a47c58c96908821c9802c Energies, Vol 7, Iss 7, Pp 4169-4184 (2014) geothermal maintenance system Kano analysis Technology T article 2014 ftdoajarticles https://doi.org/10.3390/en7074169 2022-12-31T00:15:52Z A quantitative Kano model is used in this study to identify which features are preferred by top-level maintenance engineers within Icelandic geothermal power plants to be implemented in a maintenance tool or software. Visits were conducted to the largest Icelandic energy companies operating geothermal power plants. Thorough interviews with chiefs of operations and maintenance were used as a basis for a quantitative Kano analysis. Thirty seven percent of all maintenance engineers at Reykjavik Energy and Landsvirkjun, responsible for 71.5% of the total energy production from geothermal resources in Iceland, answered the Kano questionnaire. Findings show that solutions focusing on (1) planning maintenance according to condition; (2) shortening documentation times; and (3) risk analysis are sought after by the energy companies but not provided for the geothermal sector specifically. Article in Journal/Newspaper Iceland Directory of Open Access Journals: DOAJ Articles Energies 7 7 4169 4184 |
institution |
Open Polar |
collection |
Directory of Open Access Journals: DOAJ Articles |
op_collection_id |
ftdoajarticles |
language |
English |
topic |
geothermal maintenance system Kano analysis Technology T |
spellingShingle |
geothermal maintenance system Kano analysis Technology T Reynir S. Atlason Gudmundur V. Oddsson Runar Unnthorsson Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis |
topic_facet |
geothermal maintenance system Kano analysis Technology T |
description |
A quantitative Kano model is used in this study to identify which features are preferred by top-level maintenance engineers within Icelandic geothermal power plants to be implemented in a maintenance tool or software. Visits were conducted to the largest Icelandic energy companies operating geothermal power plants. Thorough interviews with chiefs of operations and maintenance were used as a basis for a quantitative Kano analysis. Thirty seven percent of all maintenance engineers at Reykjavik Energy and Landsvirkjun, responsible for 71.5% of the total energy production from geothermal resources in Iceland, answered the Kano questionnaire. Findings show that solutions focusing on (1) planning maintenance according to condition; (2) shortening documentation times; and (3) risk analysis are sought after by the energy companies but not provided for the geothermal sector specifically. |
format |
Article in Journal/Newspaper |
author |
Reynir S. Atlason Gudmundur V. Oddsson Runar Unnthorsson |
author_facet |
Reynir S. Atlason Gudmundur V. Oddsson Runar Unnthorsson |
author_sort |
Reynir S. Atlason |
title |
Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis |
title_short |
Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis |
title_full |
Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis |
title_fullStr |
Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis |
title_full_unstemmed |
Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis |
title_sort |
geothermal power plant maintenance: evaluating maintenance system needs using quantitative kano analysis |
publisher |
MDPI AG |
publishDate |
2014 |
url |
https://doi.org/10.3390/en7074169 https://doaj.org/article/95a96ebbca4a47c58c96908821c9802c |
genre |
Iceland |
genre_facet |
Iceland |
op_source |
Energies, Vol 7, Iss 7, Pp 4169-4184 (2014) |
op_relation |
http://www.mdpi.com/1996-1073/7/7/4169 https://doaj.org/toc/1996-1073 1996-1073 doi:10.3390/en7074169 https://doaj.org/article/95a96ebbca4a47c58c96908821c9802c |
op_doi |
https://doi.org/10.3390/en7074169 |
container_title |
Energies |
container_volume |
7 |
container_issue |
7 |
container_start_page |
4169 |
op_container_end_page |
4184 |
_version_ |
1766039402140663808 |