Installation of geodetic control point at the National Institute of Polar Research

A geodetic control point (named NIPR main-point) was installed in September 1985,on the roof of the Administrative Building of the National Institute of Polar Research. The geodetic coordinates are obtained by measuring distances and angles from the third-order triangulation points Shimo-Itabashi an...

Full description

Bibliographic Details
Main Authors: Akifusa Itabashi, Takeji Kometani, Kazuo Shibuya
Format: Article in Journal/Newspaper
Language:English
Japanese
Published: National Institute of Polar Research 1986
Subjects:
Online Access:https://doi.org/10.15094/00008501
https://doaj.org/article/45713284bcdc411baf4ffb1a098d1949