Highlights 2019 - Yearly status report EDEN Initiative

Almost exactly four years (March 2015 to May 2019) was the duration of the EDEN ISS project. Four years of intensive work, ups and downs - but all rewarded with the succesfull deployment of the research greenhouse in Antarctica. These four years pushed the EDEN group to a new level by establishing e...

Full description

Bibliographic Details
Main Authors: Schubert, Daniel, Zabel, Paul, Zeidler, Conrad, Vrakking, Vincent
Format: Report
Language:English
Published: 2019
Subjects:
Online Access:https://elib.dlr.de/143237/
https://elib.dlr.de/143237/1/EDEN_Highlights_2019.pdf
_version_ 1835016999057489920
author Schubert, Daniel
Zabel, Paul
Zeidler, Conrad
Vrakking, Vincent
author_facet Schubert, Daniel
Zabel, Paul
Zeidler, Conrad
Vrakking, Vincent
author_sort Schubert, Daniel
collection Unknown
description Almost exactly four years (March 2015 to May 2019) was the duration of the EDEN ISS project. Four years of intensive work, ups and downs - but all rewarded with the succesfull deployment of the research greenhouse in Antarctica. These four years pushed the EDEN group to a new level by establishing essential know-how, not only on a technical level also through the operational aspects of managing a multinational analogue mission with 15 partners from 8 countries. As the EDEN ISS container remains in Antarctica, the research and testing will continue. The year 2019 also marked an important year for the EDEN group by establishing its pathway to planetary system deployment. With the EDEN ISS NEXT design, the group established a first baseline design for future space greenhouse systems. Transferring space-rated systems to terrestrial applications was always one of the main goals of the EDEN group. With the new MEPA system and the upcoming development project, the group will design a rapid deployable food production system for crisis scenarios. The official grand opening of the educational Botanika exhibition was an important milestone for the public engagement activities of the EDEN group. The exhibit will remain a permanent part of the visitor center of the Botanika, establishing a useful communication tool for the coming years. The EDEN team looks confidently to the future as its development pathway for creating bioregenerative life support systems continues. The operation of the Antarctic research platform EDEN ISS will generate useful knowledge on the operational challenges of these systems.
format Report
genre Antarc*
Antarctic
Antarctica
genre_facet Antarc*
Antarctic
Antarctica
geographic Antarctic
The Antarctic
geographic_facet Antarctic
The Antarctic
id ftdlr:oai:elib.dlr.de:143237
institution Open Polar
language English
op_collection_id ftdlr
op_relation https://elib.dlr.de/143237/1/EDEN_Highlights_2019.pdf
Schubert, Daniel und Zabel, Paul und Zeidler, Conrad und Vrakking, Vincent (2019) Highlights 2019 - Yearly status report EDEN Initiative. sonstiger Bericht.
publishDate 2019
record_format openpolar
spelling ftdlr:oai:elib.dlr.de:143237 2025-06-15T14:09:17+00:00 Highlights 2019 - Yearly status report EDEN Initiative Schubert, Daniel Zabel, Paul Zeidler, Conrad Vrakking, Vincent 2019 application/pdf https://elib.dlr.de/143237/ https://elib.dlr.de/143237/1/EDEN_Highlights_2019.pdf en eng https://elib.dlr.de/143237/1/EDEN_Highlights_2019.pdf Schubert, Daniel und Zabel, Paul und Zeidler, Conrad und Vrakking, Vincent (2019) Highlights 2019 - Yearly status report EDEN Initiative. sonstiger Bericht. Systemanalyse Raumsegment Berichtsreihe NonPeerReviewed 2019 ftdlr 2025-06-04T04:58:10Z Almost exactly four years (March 2015 to May 2019) was the duration of the EDEN ISS project. Four years of intensive work, ups and downs - but all rewarded with the succesfull deployment of the research greenhouse in Antarctica. These four years pushed the EDEN group to a new level by establishing essential know-how, not only on a technical level also through the operational aspects of managing a multinational analogue mission with 15 partners from 8 countries. As the EDEN ISS container remains in Antarctica, the research and testing will continue. The year 2019 also marked an important year for the EDEN group by establishing its pathway to planetary system deployment. With the EDEN ISS NEXT design, the group established a first baseline design for future space greenhouse systems. Transferring space-rated systems to terrestrial applications was always one of the main goals of the EDEN group. With the new MEPA system and the upcoming development project, the group will design a rapid deployable food production system for crisis scenarios. The official grand opening of the educational Botanika exhibition was an important milestone for the public engagement activities of the EDEN group. The exhibit will remain a permanent part of the visitor center of the Botanika, establishing a useful communication tool for the coming years. The EDEN team looks confidently to the future as its development pathway for creating bioregenerative life support systems continues. The operation of the Antarctic research platform EDEN ISS will generate useful knowledge on the operational challenges of these systems. Report Antarc* Antarctic Antarctica Unknown Antarctic The Antarctic
spellingShingle Systemanalyse Raumsegment
Schubert, Daniel
Zabel, Paul
Zeidler, Conrad
Vrakking, Vincent
Highlights 2019 - Yearly status report EDEN Initiative
title Highlights 2019 - Yearly status report EDEN Initiative
title_full Highlights 2019 - Yearly status report EDEN Initiative
title_fullStr Highlights 2019 - Yearly status report EDEN Initiative
title_full_unstemmed Highlights 2019 - Yearly status report EDEN Initiative
title_short Highlights 2019 - Yearly status report EDEN Initiative
title_sort highlights 2019 - yearly status report eden initiative
topic Systemanalyse Raumsegment
topic_facet Systemanalyse Raumsegment
url https://elib.dlr.de/143237/
https://elib.dlr.de/143237/1/EDEN_Highlights_2019.pdf