Highlights 2017 - Yearly status report EDEN Initiative
December 17th - CapeTown - South Africa: The EDEN team finishes its last preparations for the upcoming EDEN ISS mission. The next day, the adventure will begin with the inbound flight to the Russian Novo Airbase; Location: Antarctica. From there, the team flies to the German Neumayer Station III, th...
Main Authors: | , , , |
---|---|
Format: | Report |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://elib.dlr.de/143235/ https://elib.dlr.de/143235/1/EDEN%20Highlights_2017.pdf |
id |
ftdlr:oai:elib.dlr.de:143235 |
---|---|
record_format |
openpolar |
spelling |
ftdlr:oai:elib.dlr.de:143235 2023-05-15T13:49:17+02:00 Highlights 2017 - Yearly status report EDEN Initiative Schubert, Daniel Zabel, Paul Zeidler, Conrad Vrakking, Vincent 2017 application/pdf https://elib.dlr.de/143235/ https://elib.dlr.de/143235/1/EDEN%20Highlights_2017.pdf en eng https://elib.dlr.de/143235/1/EDEN%20Highlights_2017.pdf Schubert, Daniel und Zabel, Paul und Zeidler, Conrad und Vrakking, Vincent (2017) Highlights 2017 - Yearly status report EDEN Initiative. sonstiger Bericht. Systemanalyse Raumsegment Berichtsreihe NonPeerReviewed 2017 ftdlr 2021-08-08T14:30:21Z December 17th - CapeTown - South Africa: The EDEN team finishes its last preparations for the upcoming EDEN ISS mission. The next day, the adventure will begin with the inbound flight to the Russian Novo Airbase; Location: Antarctica. From there, the team flies to the German Neumayer Station III, the group’s new test ground for the developed closed-loop greenhouse system. Four years of intense planning, hardware development, testing and enhancements finally brought the EDEN team to the eve of the start of the long-awaited Antarctic mission. For the next eight weeks, the team will pick up the EDEN ISS Mobile Test Facility at the shelf ice and then build up the system in the vicinity of the station. The year 2017 marked an extraordinary year, as all essential controlled environment agriculture subsystems were integrated into the EDEN ISS greenhouse system. Located in the backyard of the DLR Institute of Space Systems in Bremen (Germany), the container was the place of intensive work, where the EDEN team and its consortium partners successfully accomplished all important assembly, integration, and test (AIT) procedures. Then from May until September, the greenhouse system provided suitable conditions for plant growth so that several test grow-outs could be performed. In June, the successfully organized Flight Readiness Review (FRR) marked an important milestone for the EDEN team. The European Union and the scientific advisory board gave a green light for the planned analogue test mission. An additional highlight of the year were the kick-offs of the two projects PMARS and GERF, which are both funded through the German Ministry of Research (BmBF). With partners, located in Morocco and Egypt, the projects foresee the adaptation and transfer of EDEN’s developed greenhouse technologies into terrestrial systems, in order to provide a closed-loop food production system in desert and arid areas. The EDEN team looks forward to proceeding with the upcoming research tasks in 2018. Through the Antarctic mission and the implementation of the newly built mission control center in Bremen, the team is confident that they can help contribute to the advancement of knowledge related to plant cultivation in extreme environments, needed for future missions to Moon and Mars. Report Antarc* Antarctic Antarctica German Aerospace Center: elib - DLR electronic library Antarctic The Antarctic Neumayer Neumayer Station |
institution |
Open Polar |
collection |
German Aerospace Center: elib - DLR electronic library |
op_collection_id |
ftdlr |
language |
English |
topic |
Systemanalyse Raumsegment |
spellingShingle |
Systemanalyse Raumsegment Schubert, Daniel Zabel, Paul Zeidler, Conrad Vrakking, Vincent Highlights 2017 - Yearly status report EDEN Initiative |
topic_facet |
Systemanalyse Raumsegment |
description |
December 17th - CapeTown - South Africa: The EDEN team finishes its last preparations for the upcoming EDEN ISS mission. The next day, the adventure will begin with the inbound flight to the Russian Novo Airbase; Location: Antarctica. From there, the team flies to the German Neumayer Station III, the group’s new test ground for the developed closed-loop greenhouse system. Four years of intense planning, hardware development, testing and enhancements finally brought the EDEN team to the eve of the start of the long-awaited Antarctic mission. For the next eight weeks, the team will pick up the EDEN ISS Mobile Test Facility at the shelf ice and then build up the system in the vicinity of the station. The year 2017 marked an extraordinary year, as all essential controlled environment agriculture subsystems were integrated into the EDEN ISS greenhouse system. Located in the backyard of the DLR Institute of Space Systems in Bremen (Germany), the container was the place of intensive work, where the EDEN team and its consortium partners successfully accomplished all important assembly, integration, and test (AIT) procedures. Then from May until September, the greenhouse system provided suitable conditions for plant growth so that several test grow-outs could be performed. In June, the successfully organized Flight Readiness Review (FRR) marked an important milestone for the EDEN team. The European Union and the scientific advisory board gave a green light for the planned analogue test mission. An additional highlight of the year were the kick-offs of the two projects PMARS and GERF, which are both funded through the German Ministry of Research (BmBF). With partners, located in Morocco and Egypt, the projects foresee the adaptation and transfer of EDEN’s developed greenhouse technologies into terrestrial systems, in order to provide a closed-loop food production system in desert and arid areas. The EDEN team looks forward to proceeding with the upcoming research tasks in 2018. Through the Antarctic mission and the implementation of the newly built mission control center in Bremen, the team is confident that they can help contribute to the advancement of knowledge related to plant cultivation in extreme environments, needed for future missions to Moon and Mars. |
format |
Report |
author |
Schubert, Daniel Zabel, Paul Zeidler, Conrad Vrakking, Vincent |
author_facet |
Schubert, Daniel Zabel, Paul Zeidler, Conrad Vrakking, Vincent |
author_sort |
Schubert, Daniel |
title |
Highlights 2017 - Yearly status report EDEN Initiative |
title_short |
Highlights 2017 - Yearly status report EDEN Initiative |
title_full |
Highlights 2017 - Yearly status report EDEN Initiative |
title_fullStr |
Highlights 2017 - Yearly status report EDEN Initiative |
title_full_unstemmed |
Highlights 2017 - Yearly status report EDEN Initiative |
title_sort |
highlights 2017 - yearly status report eden initiative |
publishDate |
2017 |
url |
https://elib.dlr.de/143235/ https://elib.dlr.de/143235/1/EDEN%20Highlights_2017.pdf |
geographic |
Antarctic The Antarctic Neumayer Neumayer Station |
geographic_facet |
Antarctic The Antarctic Neumayer Neumayer Station |
genre |
Antarc* Antarctic Antarctica |
genre_facet |
Antarc* Antarctic Antarctica |
op_relation |
https://elib.dlr.de/143235/1/EDEN%20Highlights_2017.pdf Schubert, Daniel und Zabel, Paul und Zeidler, Conrad und Vrakking, Vincent (2017) Highlights 2017 - Yearly status report EDEN Initiative. sonstiger Bericht. |
_version_ |
1766251114006577152 |