Implementing a production schedule at LKAB's Kiruna Mine

LKAB's Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly using an underground mining method known as sublevel caving. To efficiently run the mills that process the iron ore, the mine must deliver planned quantities of three ore types. We used mixed-integ...

Full description

Bibliographic Details
Published in:Interfaces
Main Authors: Kuchta, M, Newman, A, Topal, E
Format: Article in Journal/Newspaper
Language:English
Published: Informs 2004
Subjects:
Online Access:https://hdl.handle.net/11468/18364
https://doi.org/10.1287/inte.1030.0059
id ftdicleuniv:oai:acikerisim.dicle.edu.tr:11468/18364
record_format openpolar
spelling ftdicleuniv:oai:acikerisim.dicle.edu.tr:11468/18364 2024-05-19T07:43:29+00:00 Implementing a production schedule at LKAB's Kiruna Mine Kuchta, M Newman, A Topal, E 2004 https://hdl.handle.net/11468/18364 https://doi.org/10.1287/inte.1030.0059 en eng Informs Interfaces Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı 0092-2102 1526-551X https://doi.org/10.1287/inte.1030.0059 https://hdl.handle.net/11468/18364 34 2 124 134 WOS:000220908700008 2-s2.0-2442504659 doi:10.1287/inte.1030.0059 Q2 Q3 info:eu-repo/semantics/closedAccess Production And Scheduling Applications Article 2004 ftdicleuniv https://doi.org/10.1287/inte.1030.0059 2024-04-30T03:37:09Z LKAB's Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly using an underground mining method known as sublevel caving. To efficiently run the mills that process the iron ore, the mine must deliver planned quantities of three ore types. We used mixed-integer programming to schedule Kiruna's operations, specifically, which production blocks to mine and when to mine them to minimize deviations from monthly planned production quantities while adhering to operational restrictions. These production schedules save costs compared to schedules produced manually by meeting desired production quantities more closely and reducing employee time spent on preparing schedules. Article in Journal/Newspaper Kiruna Northern Sweden Dicle University Institutional Repository (DSpace@Dicle) Interfaces 34 2 124 134
institution Open Polar
collection Dicle University Institutional Repository (DSpace@Dicle)
op_collection_id ftdicleuniv
language English
topic Production And Scheduling
Applications
spellingShingle Production And Scheduling
Applications
Kuchta, M
Newman, A
Topal, E
Implementing a production schedule at LKAB's Kiruna Mine
topic_facet Production And Scheduling
Applications
description LKAB's Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly using an underground mining method known as sublevel caving. To efficiently run the mills that process the iron ore, the mine must deliver planned quantities of three ore types. We used mixed-integer programming to schedule Kiruna's operations, specifically, which production blocks to mine and when to mine them to minimize deviations from monthly planned production quantities while adhering to operational restrictions. These production schedules save costs compared to schedules produced manually by meeting desired production quantities more closely and reducing employee time spent on preparing schedules.
format Article in Journal/Newspaper
author Kuchta, M
Newman, A
Topal, E
author_facet Kuchta, M
Newman, A
Topal, E
author_sort Kuchta, M
title Implementing a production schedule at LKAB's Kiruna Mine
title_short Implementing a production schedule at LKAB's Kiruna Mine
title_full Implementing a production schedule at LKAB's Kiruna Mine
title_fullStr Implementing a production schedule at LKAB's Kiruna Mine
title_full_unstemmed Implementing a production schedule at LKAB's Kiruna Mine
title_sort implementing a production schedule at lkab's kiruna mine
publisher Informs
publishDate 2004
url https://hdl.handle.net/11468/18364
https://doi.org/10.1287/inte.1030.0059
genre Kiruna
Northern Sweden
genre_facet Kiruna
Northern Sweden
op_relation Interfaces
Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
0092-2102
1526-551X
https://doi.org/10.1287/inte.1030.0059
https://hdl.handle.net/11468/18364
34
2
124
134
WOS:000220908700008
2-s2.0-2442504659
doi:10.1287/inte.1030.0059
Q2
Q3
op_rights info:eu-repo/semantics/closedAccess
op_doi https://doi.org/10.1287/inte.1030.0059
container_title Interfaces
container_volume 34
container_issue 2
container_start_page 124
op_container_end_page 134
_version_ 1799483208766586880