Airborne radar bed elevation picks across the Wilkes Subglacial Basin, 2005-2006 ...

This data set contains bed and surface elevation picks derived from airborne radar collected during the WISE/ISODYN project. This collaborative UK/Italian project collected ~ 61000 line km of new aerogeophysical data during the 2005/2006 austral summer, over the previously poorly surveyed Wilkes sub...

Full description

Bibliographic Details
Main Authors: Ferraccioli, Fausto, Corr, Hugh, Jordan, Tom, Robinson, Carl, Armadillo, Egidio, Armadillo, Emanuele, Armadillo, Giorgio
Format: Dataset
Language:English
Published: Polar Data Centre, Natural Environment Research Council, UK 2018
Subjects:
Online Access:https://dx.doi.org/10.5285/59e5a6f5-e67d-4a05-99af-30f656569401
https://data.bas.ac.uk/full-record.php?id=GB/NERC/BAS/PDC/01075
Description
Summary:This data set contains bed and surface elevation picks derived from airborne radar collected during the WISE/ISODYN project. This collaborative UK/Italian project collected ~ 61000 line km of new aerogeophysical data during the 2005/2006 austral summer, over the previously poorly surveyed Wilkes subglacial basin, Dome C, George V Land and Northern Victoria Land. ... : The standard deviation of the bed elevation for all crossover errors for the radar data is 33.3 m. However, this value is skewed by a few high error points in regions of more extreme topography. Over areas with smoother topography the standard deviation of the crossovers is ~10 m. Resolution: The line spacing for the main survey area is 8.8km, with tie lines 44 km apart. Additional regional lines explore specific targets. The along track sample spacing is 20 m. Radar data were collected using the PASIN radar echo sounding system (table 1 (Corr et al., 2007)). Data provided here includes picks and derived elevations of the ice sheet surface and bed. Bed reflections were picked from the radargram after unfocused synthetic aperture (SAR) processing. The bed reflector was picked in a semi-automated manner within the seismic processing package ProMax. An automatic first break picker was applied initially, with subsequent manual editing/removal of picks which appear unreasonable. The final sample spacing of the ...