Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset

Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System Considered scenario years: 2030, 2040 and 2050 The profiles are based on the historical year 2016. Two scenarios are included: lower conne...

Full description

Bibliographic Details
Main Author: Ritter, David
Format: Dataset
Language:English
Published: Zenodo 2019
Subjects:
Online Access:https://dx.doi.org/10.5281/zenodo.3257495
https://zenodo.org/record/3257495