Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset
Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System Considered scenario years: 2030, 2040 and 2050 The profiles are based on the historical year 2016. Two scenarios are included: lower conne...
Main Author: | |
---|---|
Format: | Dataset |
Language: | English |
Published: |
Zenodo
2019
|
Subjects: | |
Online Access: | https://dx.doi.org/10.5281/zenodo.3257494 https://zenodo.org/record/3257494 |
id |
ftdatacite:10.5281/zenodo.3257494 |
---|---|
record_format |
openpolar |
spelling |
ftdatacite:10.5281/zenodo.3257494 2023-05-15T16:51:27+02:00 Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset Ritter, David 2019 https://dx.doi.org/10.5281/zenodo.3257494 https://zenodo.org/record/3257494 en eng Zenodo https://dx.doi.org/10.5281/zenodo.3257495 Open Access Creative Commons Attribution 4.0 International https://creativecommons.org/licenses/by/4.0/legalcode cc-by-4.0 info:eu-repo/semantics/openAccess CC-BY dataset Dataset 2019 ftdatacite https://doi.org/10.5281/zenodo.3257494 https://doi.org/10.5281/zenodo.3257495 2021-11-05T12:55:41Z Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System Considered scenario years: 2030, 2040 and 2050 The profiles are based on the historical year 2016. Two scenarios are included: lower connectivity and high connectivity The data cover the ENTSO-E member countries except Iceland and Cyprus and is given in country-specific resolution. Input: Demand as hourly profile in MWh Variable RES-E as hourly profile in MWh Power plant fleet as capacities in MW NTCs as capacities in MW Output: CO2 emissions as annual data in Mt Variable electricity generation costs as annual data in MEur Variable electricity generation costs per generation as annual data in Euro/MWh Electricity generation as annual data in TWh Electricity export as annual data in TWh Electricity import as annual data in TWh Transit flows as annual data in TWh The sources are described in the corresponding paper under the following link: https://www.mdpi.com/1996-1073/12/16/3098 : {"references": ["Repenning, J.; Hermann, H.; Emele, L.; J\u00f6r\u00df, W.; Blanck, R.; Loreck, C.; B\u00f6ttcher, H.; Ludig, S.; Dehoust, G.; Matthes, Felix Chr. et al. Klimaschutzszenario 2050. 2. Modellierungsrunde, Berlin, 2015. Available online: https://www.oeko.de/oekodoc/2451/2015-608-de.pdf", "Andersky, T.; Sanchis, G.; Betraoui, B. e-Highway 2050 - Database per country. Excel-Sheet, 2016", "ENTSO-E. Transparency Platform. Available online: https://transparency.entsoe.eu/", "ENTSO-E. TYNDP 2018 Scenario Report. Data set, Brussels, 2018. Available online: https://tyndp.entsoe.eu/maps-data/"]} Dataset Iceland DataCite Metadata Store (German National Library of Science and Technology) Matthes ENVELOPE(-65.833,-65.833,-67.500,-67.500) |
institution |
Open Polar |
collection |
DataCite Metadata Store (German National Library of Science and Technology) |
op_collection_id |
ftdatacite |
language |
English |
description |
Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System Considered scenario years: 2030, 2040 and 2050 The profiles are based on the historical year 2016. Two scenarios are included: lower connectivity and high connectivity The data cover the ENTSO-E member countries except Iceland and Cyprus and is given in country-specific resolution. Input: Demand as hourly profile in MWh Variable RES-E as hourly profile in MWh Power plant fleet as capacities in MW NTCs as capacities in MW Output: CO2 emissions as annual data in Mt Variable electricity generation costs as annual data in MEur Variable electricity generation costs per generation as annual data in Euro/MWh Electricity generation as annual data in TWh Electricity export as annual data in TWh Electricity import as annual data in TWh Transit flows as annual data in TWh The sources are described in the corresponding paper under the following link: https://www.mdpi.com/1996-1073/12/16/3098 : {"references": ["Repenning, J.; Hermann, H.; Emele, L.; J\u00f6r\u00df, W.; Blanck, R.; Loreck, C.; B\u00f6ttcher, H.; Ludig, S.; Dehoust, G.; Matthes, Felix Chr. et al. Klimaschutzszenario 2050. 2. Modellierungsrunde, Berlin, 2015. Available online: https://www.oeko.de/oekodoc/2451/2015-608-de.pdf", "Andersky, T.; Sanchis, G.; Betraoui, B. e-Highway 2050 - Database per country. Excel-Sheet, 2016", "ENTSO-E. Transparency Platform. Available online: https://transparency.entsoe.eu/", "ENTSO-E. TYNDP 2018 Scenario Report. Data set, Brussels, 2018. Available online: https://tyndp.entsoe.eu/maps-data/"]} |
format |
Dataset |
author |
Ritter, David |
spellingShingle |
Ritter, David Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset |
author_facet |
Ritter, David |
author_sort |
Ritter, David |
title |
Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset |
title_short |
Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset |
title_full |
Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset |
title_fullStr |
Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset |
title_full_unstemmed |
Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset |
title_sort |
effects of a delayed expansion of interconnector capacities in a high res-e european electricity system - dataset |
publisher |
Zenodo |
publishDate |
2019 |
url |
https://dx.doi.org/10.5281/zenodo.3257494 https://zenodo.org/record/3257494 |
long_lat |
ENVELOPE(-65.833,-65.833,-67.500,-67.500) |
geographic |
Matthes |
geographic_facet |
Matthes |
genre |
Iceland |
genre_facet |
Iceland |
op_relation |
https://dx.doi.org/10.5281/zenodo.3257495 |
op_rights |
Open Access Creative Commons Attribution 4.0 International https://creativecommons.org/licenses/by/4.0/legalcode cc-by-4.0 info:eu-repo/semantics/openAccess |
op_rightsnorm |
CC-BY |
op_doi |
https://doi.org/10.5281/zenodo.3257494 https://doi.org/10.5281/zenodo.3257495 |
_version_ |
1766041560206540800 |