D5.1 Initial System Test Report

This document describes the overall deployment of the EDEN ISS Mobile Test Facility to Antarctica. It builds upon the EDEN ISS-DLR-WP4.4-D4.4-Overall System Test Report which described the assembly, integration and test phase of the project as well as the preparation and transport of the facility to...

Full description

Bibliographic Details
Main Authors: Bamsey, Matthew, Zabel, Paul, Vrakking, Vincent, Zeidler, Conrad, Schubert, Daniel
Format: Report
Language:unknown
Published: Zenodo 2018
Subjects:
Online Access:https://dx.doi.org/10.5281/zenodo.3229909
https://zenodo.org/record/3229909
Description
Summary:This document describes the overall deployment of the EDEN ISS Mobile Test Facility to Antarctica. It builds upon the EDEN ISS-DLR-WP4.4-D4.4-Overall System Test Report which described the assembly, integration and test phase of the project as well as the preparation and transport of the facility to Antarctica. This Initial System Test Report commences with the offloading of the Mobile Test Facility from the S.A. Agulhas II research vessel in the vicinity of the Neumayer Station III. It then describes the installation activities, results of initial on-site tests, issues encountered during the installation, as well as particular design modifications incorporated into the facility.