Merged Svalbard digital terrain model
A 20m DEM mosaic in UTM33 projection with newest NPI products and filtered ASTER GDEM elsewhere (South Spitsbergen and NW tip of Spitsbergen). Time span is mostly 2008-2012 for elevations, and the extent has been cut to the coastline of 2015.
Main Authors: | , , |
---|---|
Format: | Dataset |
Language: | unknown |
Published: |
npolar.no
2019
|
Subjects: | |
Online Access: | https://dx.doi.org/10.21334/npolar.2019.675565f7 https://data.npolar.no/dataset/675565f7-ce2b-4036-9653-16ccb69c0c5a |
Summary: | A 20m DEM mosaic in UTM33 projection with newest NPI products and filtered ASTER GDEM elsewhere (South Spitsbergen and NW tip of Spitsbergen). Time span is mostly 2008-2012 for elevations, and the extent has been cut to the coastline of 2015. |
---|