Planning, construction and operational challenges of Suncor’s 1st sand dump ...

In 2009, Suncor Energy Inc.’s Oil Sands operation in Fort McMurray, AB, began the process of changing to a new technology for the treatment of the tailings streams coming from their water-based extraction process. This new treatment, known collectively as Tailings Reduction Operations (TRO™), is bas...

Full description

Bibliographic Details
Main Author: Ali, Zulfiqar
Format: Text
Language:English
Published: The University of British Columbia 2011
Subjects:
Online Access:https://dx.doi.org/10.14288/1.0107696
https://doi.library.ubc.ca/10.14288/1.0107696
id ftdatacite:10.14288/1.0107696
record_format openpolar
spelling ftdatacite:10.14288/1.0107696 2024-04-28T08:19:15+00:00 Planning, construction and operational challenges of Suncor’s 1st sand dump ... Ali, Zulfiqar 2011 https://dx.doi.org/10.14288/1.0107696 https://doi.library.ubc.ca/10.14288/1.0107696 en eng The University of British Columbia article-journal Text ScholarlyArticle 2011 ftdatacite https://doi.org/10.14288/1.0107696 2024-04-02T09:56:45Z In 2009, Suncor Energy Inc.’s Oil Sands operation in Fort McMurray, AB, began the process of changing to a new technology for the treatment of the tailings streams coming from their water-based extraction process. This new treatment, known collectively as Tailings Reduction Operations (TRO™), is based on two primary technologies: Mature fine tailings (MFT) drying, and the construction of elevated and draining sand dumps. Most of the public information on TRO™ has been focused on the MFT drying components, with less attention paid to the technically simpler but operationally complex systems required to build stacks of tailings sand contained within sand dykes at the rates required to sustain production. This paper discusses the planning and operational challenges of constructing the sand dump rising at the rate of 20 meters per year while maintaining continuous oil sands production and structural integrity of the dump. [All papers were considered for technical and language appropriateness by the organizing ... Text Fort McMurray DataCite Metadata Store (German National Library of Science and Technology)
institution Open Polar
collection DataCite Metadata Store (German National Library of Science and Technology)
op_collection_id ftdatacite
language English
description In 2009, Suncor Energy Inc.’s Oil Sands operation in Fort McMurray, AB, began the process of changing to a new technology for the treatment of the tailings streams coming from their water-based extraction process. This new treatment, known collectively as Tailings Reduction Operations (TRO™), is based on two primary technologies: Mature fine tailings (MFT) drying, and the construction of elevated and draining sand dumps. Most of the public information on TRO™ has been focused on the MFT drying components, with less attention paid to the technically simpler but operationally complex systems required to build stacks of tailings sand contained within sand dykes at the rates required to sustain production. This paper discusses the planning and operational challenges of constructing the sand dump rising at the rate of 20 meters per year while maintaining continuous oil sands production and structural integrity of the dump. [All papers were considered for technical and language appropriateness by the organizing ...
format Text
author Ali, Zulfiqar
spellingShingle Ali, Zulfiqar
Planning, construction and operational challenges of Suncor’s 1st sand dump ...
author_facet Ali, Zulfiqar
author_sort Ali, Zulfiqar
title Planning, construction and operational challenges of Suncor’s 1st sand dump ...
title_short Planning, construction and operational challenges of Suncor’s 1st sand dump ...
title_full Planning, construction and operational challenges of Suncor’s 1st sand dump ...
title_fullStr Planning, construction and operational challenges of Suncor’s 1st sand dump ...
title_full_unstemmed Planning, construction and operational challenges of Suncor’s 1st sand dump ...
title_sort planning, construction and operational challenges of suncor’s 1st sand dump ...
publisher The University of British Columbia
publishDate 2011
url https://dx.doi.org/10.14288/1.0107696
https://doi.library.ubc.ca/10.14288/1.0107696
genre Fort McMurray
genre_facet Fort McMurray
op_doi https://doi.org/10.14288/1.0107696
_version_ 1797582856931770368