Risk profile modeling for large scale projects : case study of a transmission line project ...

Over the next several years in North America, the power grid needs to be revitalized and extended to deal with aging infrastructure, capacity constraints, and the pursuit of renewable energy sources. In Canada, and particularly the province of BC, very significant complexity and risk is involved in...

Full description

Bibliographic Details
Main Author: Orozco Mojica, Diego
Format: Text
Language:English
Published: University of British Columbia 2013
Subjects:
Online Access:https://dx.doi.org/10.14288/1.0073714
https://doi.library.ubc.ca/10.14288/1.0073714
Description
Summary:Over the next several years in North America, the power grid needs to be revitalized and extended to deal with aging infrastructure, capacity constraints, and the pursuit of renewable energy sources. In Canada, and particularly the province of BC, very significant complexity and risk is involved in the approval, design and construction of such projects given highly variable terrain and weather conditions, the multiplicity of the environmental, First Nations, and third part stakeholder issues involved, and challenging regulatory and procurement processes. Described in this research is a holistic approach to the identification of risk as a function of project context, the representation of which is made difficult in the context of transmission line projects because of their large spatial scope and the vast volume of data of different types to be distilled and analyzed. Central to the approach is the representation of a project within an integrated environment in the form of multiple views of a project – ...