Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ...

During the Summer of 1997 the City of Whitehorse undertook reconstruction of the Robert Service Way, one of the two key access routes to the downtown core of Whitehorse, Yukon. Based on previous fisheries investigations, it was determined that the road embankment fill required for reconstruction wou...

Full description

Bibliographic Details
Main Author: Snider, R. C.
Format: Text
Language:English
Published: The University of British Columbia 2009
Subjects:
Online Access:https://dx.doi.org/10.14288/1.0042335
https://doi.library.ubc.ca/10.14288/1.0042335
id ftdatacite:10.14288/1.0042335
record_format openpolar
spelling ftdatacite:10.14288/1.0042335 2024-04-28T08:41:16+00:00 Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ... Snider, R. C. 2009 https://dx.doi.org/10.14288/1.0042335 https://doi.library.ubc.ca/10.14288/1.0042335 en eng The University of British Columbia article-journal Text ScholarlyArticle 2009 ftdatacite https://doi.org/10.14288/1.0042335 2024-04-02T09:56:45Z During the Summer of 1997 the City of Whitehorse undertook reconstruction of the Robert Service Way, one of the two key access routes to the downtown core of Whitehorse, Yukon. Based on previous fisheries investigations, it was determined that the road embankment fill required for reconstruction would cover critical rearing, overwintering and spawning habitat for chinook salmon. A fisheries compensation agreement was reached whereby the City would construct three compensation channels within the Yukon River to provide spawning and rearing habitats for the salmon. During instream fill placement and construction of the compensation channels, there was a requirement to monitor suspended solids levels on a daily basis, and more frequently during specific construction activities. An agreement was reached between the City of Whitehorse and the Department of Fisheries and Oceans (DFO) to monitor total suspended solids (TSS) daily using a portable turbidity meter based on a regression analysis of TSS and turbidity. ... Text Whitehorse Yukon river Yukon DataCite Metadata Store (German National Library of Science and Technology)
institution Open Polar
collection DataCite Metadata Store (German National Library of Science and Technology)
op_collection_id ftdatacite
language English
description During the Summer of 1997 the City of Whitehorse undertook reconstruction of the Robert Service Way, one of the two key access routes to the downtown core of Whitehorse, Yukon. Based on previous fisheries investigations, it was determined that the road embankment fill required for reconstruction would cover critical rearing, overwintering and spawning habitat for chinook salmon. A fisheries compensation agreement was reached whereby the City would construct three compensation channels within the Yukon River to provide spawning and rearing habitats for the salmon. During instream fill placement and construction of the compensation channels, there was a requirement to monitor suspended solids levels on a daily basis, and more frequently during specific construction activities. An agreement was reached between the City of Whitehorse and the Department of Fisheries and Oceans (DFO) to monitor total suspended solids (TSS) daily using a portable turbidity meter based on a regression analysis of TSS and turbidity. ...
format Text
author Snider, R. C.
spellingShingle Snider, R. C.
Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ...
author_facet Snider, R. C.
author_sort Snider, R. C.
title Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ...
title_short Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ...
title_full Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ...
title_fullStr Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ...
title_full_unstemmed Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ...
title_sort sediment control during instream construction using a regression analysis : robert service way reconstruction project, city of whitehorse, yukon ...
publisher The University of British Columbia
publishDate 2009
url https://dx.doi.org/10.14288/1.0042335
https://doi.library.ubc.ca/10.14288/1.0042335
genre Whitehorse
Yukon river
Yukon
genre_facet Whitehorse
Yukon river
Yukon
op_doi https://doi.org/10.14288/1.0042335
_version_ 1797571583799197696