Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ...
During the Summer of 1997 the City of Whitehorse undertook reconstruction of the Robert Service Way, one of the two key access routes to the downtown core of Whitehorse, Yukon. Based on previous fisheries investigations, it was determined that the road embankment fill required for reconstruction wou...
Main Author: | |
---|---|
Format: | Text |
Language: | English |
Published: |
The University of British Columbia
2009
|
Subjects: | |
Online Access: | https://dx.doi.org/10.14288/1.0042335 https://doi.library.ubc.ca/10.14288/1.0042335 |
id |
ftdatacite:10.14288/1.0042335 |
---|---|
record_format |
openpolar |
spelling |
ftdatacite:10.14288/1.0042335 2024-04-28T08:41:16+00:00 Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ... Snider, R. C. 2009 https://dx.doi.org/10.14288/1.0042335 https://doi.library.ubc.ca/10.14288/1.0042335 en eng The University of British Columbia article-journal Text ScholarlyArticle 2009 ftdatacite https://doi.org/10.14288/1.0042335 2024-04-02T09:56:45Z During the Summer of 1997 the City of Whitehorse undertook reconstruction of the Robert Service Way, one of the two key access routes to the downtown core of Whitehorse, Yukon. Based on previous fisheries investigations, it was determined that the road embankment fill required for reconstruction would cover critical rearing, overwintering and spawning habitat for chinook salmon. A fisheries compensation agreement was reached whereby the City would construct three compensation channels within the Yukon River to provide spawning and rearing habitats for the salmon. During instream fill placement and construction of the compensation channels, there was a requirement to monitor suspended solids levels on a daily basis, and more frequently during specific construction activities. An agreement was reached between the City of Whitehorse and the Department of Fisheries and Oceans (DFO) to monitor total suspended solids (TSS) daily using a portable turbidity meter based on a regression analysis of TSS and turbidity. ... Text Whitehorse Yukon river Yukon DataCite Metadata Store (German National Library of Science and Technology) |
institution |
Open Polar |
collection |
DataCite Metadata Store (German National Library of Science and Technology) |
op_collection_id |
ftdatacite |
language |
English |
description |
During the Summer of 1997 the City of Whitehorse undertook reconstruction of the Robert Service Way, one of the two key access routes to the downtown core of Whitehorse, Yukon. Based on previous fisheries investigations, it was determined that the road embankment fill required for reconstruction would cover critical rearing, overwintering and spawning habitat for chinook salmon. A fisheries compensation agreement was reached whereby the City would construct three compensation channels within the Yukon River to provide spawning and rearing habitats for the salmon. During instream fill placement and construction of the compensation channels, there was a requirement to monitor suspended solids levels on a daily basis, and more frequently during specific construction activities. An agreement was reached between the City of Whitehorse and the Department of Fisheries and Oceans (DFO) to monitor total suspended solids (TSS) daily using a portable turbidity meter based on a regression analysis of TSS and turbidity. ... |
format |
Text |
author |
Snider, R. C. |
spellingShingle |
Snider, R. C. Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ... |
author_facet |
Snider, R. C. |
author_sort |
Snider, R. C. |
title |
Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ... |
title_short |
Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ... |
title_full |
Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ... |
title_fullStr |
Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ... |
title_full_unstemmed |
Sediment control during instream construction using a regression analysis : Robert Service Way Reconstruction Project, City of Whitehorse, Yukon ... |
title_sort |
sediment control during instream construction using a regression analysis : robert service way reconstruction project, city of whitehorse, yukon ... |
publisher |
The University of British Columbia |
publishDate |
2009 |
url |
https://dx.doi.org/10.14288/1.0042335 https://doi.library.ubc.ca/10.14288/1.0042335 |
genre |
Whitehorse Yukon river Yukon |
genre_facet |
Whitehorse Yukon river Yukon |
op_doi |
https://doi.org/10.14288/1.0042335 |
_version_ |
1797571583799197696 |