doi 10.1287/inte.1030.0059 ©2004 INFORMS Implementing a Production Schedule at LKAB’s Kiruna Mine

LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly using an underground mining method known as sublevel caving. To efficiently run the mills that process the iron ore, the mine must deliver planned quantities of three ore types. We used mixed-integer pr...

Full description

Bibliographic Details
Main Authors: Mark Kuchta, Alexandra Newman, Erkan Topal
Other Authors: The Pennsylvania State University CiteSeerX Archives
Format: Text
Language:English
Subjects:
Online Access:http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.566.1623
http://inside.mines.edu/~anewman/Kiruna_interfaces.pdf
id ftciteseerx:oai:CiteSeerX.psu:10.1.1.566.1623
record_format openpolar
spelling ftciteseerx:oai:CiteSeerX.psu:10.1.1.566.1623 2023-05-15T17:04:09+02:00 doi 10.1287/inte.1030.0059 ©2004 INFORMS Implementing a Production Schedule at LKAB’s Kiruna Mine Mark Kuchta Alexandra Newman Erkan Topal The Pennsylvania State University CiteSeerX Archives application/pdf http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.566.1623 http://inside.mines.edu/~anewman/Kiruna_interfaces.pdf en eng http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.566.1623 http://inside.mines.edu/~anewman/Kiruna_interfaces.pdf Metadata may be used without restrictions as long as the oai identifier remains attached to it. http://inside.mines.edu/~anewman/Kiruna_interfaces.pdf text ftciteseerx 2016-01-08T12:16:10Z LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly using an underground mining method known as sublevel caving. To efficiently run the mills that process the iron ore, the mine must deliver planned quantities of three ore types. We used mixed-integer programming to schedule Kiruna’s operations, specifically, which production blocks to mine and when to mine them to minimize devia-tions from monthly planned production quantities while adhering to operational restrictions. These production schedules save costs compared to schedules produced manually by meeting desired production quantities more closely and reducing employee time spent on preparing schedules. Key words: production and scheduling: applications. History: This paper was refereed. Planning an underground mine is a complex pro-cedure consisting of five stages: (1) determining the geometry and grade (or quality) distribution of the ore body, (2) deciding how to mine the ore, that is, by surface or underground mining, (3) designing the mine infrastructure, that is, how to lay out the mine to mine and retrieve ore efficiently, (4) plan- Text Kiruna Northern Sweden Unknown Kiruna
institution Open Polar
collection Unknown
op_collection_id ftciteseerx
language English
description LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly using an underground mining method known as sublevel caving. To efficiently run the mills that process the iron ore, the mine must deliver planned quantities of three ore types. We used mixed-integer programming to schedule Kiruna’s operations, specifically, which production blocks to mine and when to mine them to minimize devia-tions from monthly planned production quantities while adhering to operational restrictions. These production schedules save costs compared to schedules produced manually by meeting desired production quantities more closely and reducing employee time spent on preparing schedules. Key words: production and scheduling: applications. History: This paper was refereed. Planning an underground mine is a complex pro-cedure consisting of five stages: (1) determining the geometry and grade (or quality) distribution of the ore body, (2) deciding how to mine the ore, that is, by surface or underground mining, (3) designing the mine infrastructure, that is, how to lay out the mine to mine and retrieve ore efficiently, (4) plan-
author2 The Pennsylvania State University CiteSeerX Archives
format Text
author Mark Kuchta
Alexandra Newman
Erkan Topal
spellingShingle Mark Kuchta
Alexandra Newman
Erkan Topal
doi 10.1287/inte.1030.0059 ©2004 INFORMS Implementing a Production Schedule at LKAB’s Kiruna Mine
author_facet Mark Kuchta
Alexandra Newman
Erkan Topal
author_sort Mark Kuchta
title doi 10.1287/inte.1030.0059 ©2004 INFORMS Implementing a Production Schedule at LKAB’s Kiruna Mine
title_short doi 10.1287/inte.1030.0059 ©2004 INFORMS Implementing a Production Schedule at LKAB’s Kiruna Mine
title_full doi 10.1287/inte.1030.0059 ©2004 INFORMS Implementing a Production Schedule at LKAB’s Kiruna Mine
title_fullStr doi 10.1287/inte.1030.0059 ©2004 INFORMS Implementing a Production Schedule at LKAB’s Kiruna Mine
title_full_unstemmed doi 10.1287/inte.1030.0059 ©2004 INFORMS Implementing a Production Schedule at LKAB’s Kiruna Mine
title_sort doi 10.1287/inte.1030.0059 ©2004 informs implementing a production schedule at lkab’s kiruna mine
url http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.566.1623
http://inside.mines.edu/~anewman/Kiruna_interfaces.pdf
geographic Kiruna
geographic_facet Kiruna
genre Kiruna
Northern Sweden
genre_facet Kiruna
Northern Sweden
op_source http://inside.mines.edu/~anewman/Kiruna_interfaces.pdf
op_relation http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.566.1623
http://inside.mines.edu/~anewman/Kiruna_interfaces.pdf
op_rights Metadata may be used without restrictions as long as the oai identifier remains attached to it.
_version_ 1766058195088834560