SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES

The Dene Hamlet of Tulita is located east of the Great Bear Lake, at the junction of the Mackenzie and Great Bear Rivers, in the Sahtu region of the Northwest Territories. For 22 years, this Hamlet hosted a power generating plant whose operations, together with some accidental petroleum hydrocarbon...

Full description

Bibliographic Details
Main Authors: Yvan Pouliot, Nicolas Moreau, Eric Thomassin-lacroix
Other Authors: The Pennsylvania State University CiteSeerX Archives
Format: Text
Language:English
Subjects:
Online Access:http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.498.6062
http://www.esaa-events.com/remtech/2005/pdf/Paper39.pdf
id ftciteseerx:oai:CiteSeerX.psu:10.1.1.498.6062
record_format openpolar
spelling ftciteseerx:oai:CiteSeerX.psu:10.1.1.498.6062 2023-05-15T16:23:00+02:00 SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES Yvan Pouliot Nicolas Moreau Eric Thomassin-lacroix The Pennsylvania State University CiteSeerX Archives application/pdf http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.498.6062 http://www.esaa-events.com/remtech/2005/pdf/Paper39.pdf en eng http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.498.6062 http://www.esaa-events.com/remtech/2005/pdf/Paper39.pdf Metadata may be used without restrictions as long as the oai identifier remains attached to it. http://www.esaa-events.com/remtech/2005/pdf/Paper39.pdf text ftciteseerx 2016-01-08T08:55:03Z The Dene Hamlet of Tulita is located east of the Great Bear Lake, at the junction of the Mackenzie and Great Bear Rivers, in the Sahtu region of the Northwest Territories. For 22 years, this Hamlet hosted a power generating plant whose operations, together with some accidental petroleum hydrocarbon (PHC) spills, caused a high level of soil contamination, specifically in the peat layer found in the soil. The dismantling of the former power plant and subsequent decommissioning of the site required that the site be remediated. Project challenges stemmed from the high level of soil contamination (up to 185,000 mg/kg in the peat layer) and the remote location of the community, which is only accessible by plane and barge during the short summer season. As the site was located in the center of the Hamlet, efforts were made to minimize the project impacts (odours, noise, dust, safety) to the surrounding community members. The project commenced in June 2002. The remediation guidelines used were Canada-Wide Standards (CWS) for PHC in soil, from the Canadian Council of Ministers of the Environment (CCME). In order to achieve the remediation objectives established for this project, Biogenie used its proprietary treatment process, the In situ Biopile. A volume of 8,100 m3 was treated inside the land treatment area (LTA) at an average depth of 3.0 m below ground surface. At the start of the project, the average PHC (Fractions 1 to 4) concentration was 12,500 mg/kg (n = 26). After 14 months of treatment, this concentration was reduced to 2,496 mg/kg (n = 27) representing an average removal rate of 80%. This paper outlines each major stage of the project, focusing mainly on the technical and human challenges that were encountered and how they were overcome. Text Great Bear Lake Northwest Territories Tulita Unknown Northwest Territories Canada Great Bear Lake ENVELOPE(-120.753,-120.753,65.834,65.834) Tulita ENVELOPE(-125.574,-125.574,64.902,64.902) Sahtu Region ENVELOPE(-126.852,-126.852,65.284,65.284)
institution Open Polar
collection Unknown
op_collection_id ftciteseerx
language English
description The Dene Hamlet of Tulita is located east of the Great Bear Lake, at the junction of the Mackenzie and Great Bear Rivers, in the Sahtu region of the Northwest Territories. For 22 years, this Hamlet hosted a power generating plant whose operations, together with some accidental petroleum hydrocarbon (PHC) spills, caused a high level of soil contamination, specifically in the peat layer found in the soil. The dismantling of the former power plant and subsequent decommissioning of the site required that the site be remediated. Project challenges stemmed from the high level of soil contamination (up to 185,000 mg/kg in the peat layer) and the remote location of the community, which is only accessible by plane and barge during the short summer season. As the site was located in the center of the Hamlet, efforts were made to minimize the project impacts (odours, noise, dust, safety) to the surrounding community members. The project commenced in June 2002. The remediation guidelines used were Canada-Wide Standards (CWS) for PHC in soil, from the Canadian Council of Ministers of the Environment (CCME). In order to achieve the remediation objectives established for this project, Biogenie used its proprietary treatment process, the In situ Biopile. A volume of 8,100 m3 was treated inside the land treatment area (LTA) at an average depth of 3.0 m below ground surface. At the start of the project, the average PHC (Fractions 1 to 4) concentration was 12,500 mg/kg (n = 26). After 14 months of treatment, this concentration was reduced to 2,496 mg/kg (n = 27) representing an average removal rate of 80%. This paper outlines each major stage of the project, focusing mainly on the technical and human challenges that were encountered and how they were overcome.
author2 The Pennsylvania State University CiteSeerX Archives
format Text
author Yvan Pouliot
Nicolas Moreau
Eric Thomassin-lacroix
spellingShingle Yvan Pouliot
Nicolas Moreau
Eric Thomassin-lacroix
SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES
author_facet Yvan Pouliot
Nicolas Moreau
Eric Thomassin-lacroix
author_sort Yvan Pouliot
title SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES
title_short SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES
title_full SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES
title_fullStr SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES
title_full_unstemmed SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES
title_sort soil remediation of a former power plant site in tulita, northwest territories
url http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.498.6062
http://www.esaa-events.com/remtech/2005/pdf/Paper39.pdf
long_lat ENVELOPE(-120.753,-120.753,65.834,65.834)
ENVELOPE(-125.574,-125.574,64.902,64.902)
ENVELOPE(-126.852,-126.852,65.284,65.284)
geographic Northwest Territories
Canada
Great Bear Lake
Tulita
Sahtu Region
geographic_facet Northwest Territories
Canada
Great Bear Lake
Tulita
Sahtu Region
genre Great Bear Lake
Northwest Territories
Tulita
genre_facet Great Bear Lake
Northwest Territories
Tulita
op_source http://www.esaa-events.com/remtech/2005/pdf/Paper39.pdf
op_relation http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.498.6062
http://www.esaa-events.com/remtech/2005/pdf/Paper39.pdf
op_rights Metadata may be used without restrictions as long as the oai identifier remains attached to it.
_version_ 1766011149821673472