BROADBAND IR MEASUREMENTS FOR MODIS VALIDATION Reporting Period: 10/1/98 – 9/30/99 Renewal Period: 10/1/99 – 9/30/00

The goal of this research is to provide in situ calibrated IR measurements of SST to augment the pre- and post-launch validation plan for the MODIS SST algorithm. The instrument system we are developing is called the Calibrated InfraRed In situ Measurement System, or CIRIMS. In early summer 1998, we...

Full description

Bibliographic Details
Main Author: Andrew T. Jessup
Other Authors: The Pennsylvania State University CiteSeerX Archives
Format: Text
Language:English
Published: 1999
Subjects:
Online Access:http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.138.8570
http://cirims.apl.washington.edu/papers/jessup_n1.pdf
id ftciteseerx:oai:CiteSeerX.psu:10.1.1.138.8570
record_format openpolar
spelling ftciteseerx:oai:CiteSeerX.psu:10.1.1.138.8570 2023-05-15T17:36:40+02:00 BROADBAND IR MEASUREMENTS FOR MODIS VALIDATION Reporting Period: 10/1/98 – 9/30/99 Renewal Period: 10/1/99 – 9/30/00 Andrew T. Jessup The Pennsylvania State University CiteSeerX Archives 1999 application/pdf http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.138.8570 http://cirims.apl.washington.edu/papers/jessup_n1.pdf en eng http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.138.8570 http://cirims.apl.washington.edu/papers/jessup_n1.pdf Metadata may be used without restrictions as long as the oai identifier remains attached to it. http://cirims.apl.washington.edu/papers/jessup_n1.pdf text 1999 ftciteseerx 2016-01-07T14:49:29Z The goal of this research is to provide in situ calibrated IR measurements of SST to augment the pre- and post-launch validation plan for the MODIS SST algorithm. The instrument system we are developing is called the Calibrated InfraRed In situ Measurement System, or CIRIMS. In early summer 1998, we deployed the CIRIMS prototype A on the R/V Ron Brown during the GAS EX 98 cruise in the North Atlantic. The purpose of this deployment was to evaluate a design for protecting the sensors using an IR transparent window and to compare our measurements to those of the M-AERI, which is the primary MODIS validation instrument. The results of the data analysis will be reported by Wick and Jessup [1999] at IGARSS ‘99. During the current reporting period, we developed the CIRIMS prototype B and performed extensive laboratory and outdoor testing in order to evaluate the design. The results of this testing will be presented by Jessup [1999] at IGARSS ’99 and are summarized below. Based on the progress over the past year, we refined the design and are now manufacturing CIRIMS production units #1 and #2 that will be deployed at sea during the post-launch period for Terra. At the end of June 1999, the two sea-going units will be ready for local testing, which will include laboratory, rooftop, and sea trials on an Applied Physics Laboratory (APL) vessel in Puget Sound. The first open ocean deployment in the post-launch period will be a 30-day cruise in November 1999 on the R/V Ron Brown from Seattle to the equatorial Pacific, returning to San Diego. The time period for this deployment was chosen to obtain a significant amount of early data for MODIS calibration and validation. After this first at-sea deployment, we will coordinate with Peter Minnett of MOCEAN (University of Miami) to routinely deploy the CIRIMS with the M-AERI. The CIRIMS homepage Text North Atlantic Unknown Pacific
institution Open Polar
collection Unknown
op_collection_id ftciteseerx
language English
description The goal of this research is to provide in situ calibrated IR measurements of SST to augment the pre- and post-launch validation plan for the MODIS SST algorithm. The instrument system we are developing is called the Calibrated InfraRed In situ Measurement System, or CIRIMS. In early summer 1998, we deployed the CIRIMS prototype A on the R/V Ron Brown during the GAS EX 98 cruise in the North Atlantic. The purpose of this deployment was to evaluate a design for protecting the sensors using an IR transparent window and to compare our measurements to those of the M-AERI, which is the primary MODIS validation instrument. The results of the data analysis will be reported by Wick and Jessup [1999] at IGARSS ‘99. During the current reporting period, we developed the CIRIMS prototype B and performed extensive laboratory and outdoor testing in order to evaluate the design. The results of this testing will be presented by Jessup [1999] at IGARSS ’99 and are summarized below. Based on the progress over the past year, we refined the design and are now manufacturing CIRIMS production units #1 and #2 that will be deployed at sea during the post-launch period for Terra. At the end of June 1999, the two sea-going units will be ready for local testing, which will include laboratory, rooftop, and sea trials on an Applied Physics Laboratory (APL) vessel in Puget Sound. The first open ocean deployment in the post-launch period will be a 30-day cruise in November 1999 on the R/V Ron Brown from Seattle to the equatorial Pacific, returning to San Diego. The time period for this deployment was chosen to obtain a significant amount of early data for MODIS calibration and validation. After this first at-sea deployment, we will coordinate with Peter Minnett of MOCEAN (University of Miami) to routinely deploy the CIRIMS with the M-AERI. The CIRIMS homepage
author2 The Pennsylvania State University CiteSeerX Archives
format Text
author Andrew T. Jessup
spellingShingle Andrew T. Jessup
BROADBAND IR MEASUREMENTS FOR MODIS VALIDATION Reporting Period: 10/1/98 – 9/30/99 Renewal Period: 10/1/99 – 9/30/00
author_facet Andrew T. Jessup
author_sort Andrew T. Jessup
title BROADBAND IR MEASUREMENTS FOR MODIS VALIDATION Reporting Period: 10/1/98 – 9/30/99 Renewal Period: 10/1/99 – 9/30/00
title_short BROADBAND IR MEASUREMENTS FOR MODIS VALIDATION Reporting Period: 10/1/98 – 9/30/99 Renewal Period: 10/1/99 – 9/30/00
title_full BROADBAND IR MEASUREMENTS FOR MODIS VALIDATION Reporting Period: 10/1/98 – 9/30/99 Renewal Period: 10/1/99 – 9/30/00
title_fullStr BROADBAND IR MEASUREMENTS FOR MODIS VALIDATION Reporting Period: 10/1/98 – 9/30/99 Renewal Period: 10/1/99 – 9/30/00
title_full_unstemmed BROADBAND IR MEASUREMENTS FOR MODIS VALIDATION Reporting Period: 10/1/98 – 9/30/99 Renewal Period: 10/1/99 – 9/30/00
title_sort broadband ir measurements for modis validation reporting period: 10/1/98 – 9/30/99 renewal period: 10/1/99 – 9/30/00
publishDate 1999
url http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.138.8570
http://cirims.apl.washington.edu/papers/jessup_n1.pdf
geographic Pacific
geographic_facet Pacific
genre North Atlantic
genre_facet North Atlantic
op_source http://cirims.apl.washington.edu/papers/jessup_n1.pdf
op_relation http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.138.8570
http://cirims.apl.washington.edu/papers/jessup_n1.pdf
op_rights Metadata may be used without restrictions as long as the oai identifier remains attached to it.
_version_ 1766136227588734976