CONSTRUCTION DEWATERING AT SALUDA DAM; DESIGN, TESTING, AND IMPLEMENTATION
ABSTRACT The proposed Remediation of Saluda Dam, located approximately ten miles to the west of Columbia South Carolina and owned and operated by South Carolina Electric & Gas Company (SCE&G), consists of a 5,500-foot-long Rock Fill Berm and a 2,200-foot-long Roller Compacted Concrete (RCC)...
Main Authors: | , , , , |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Subjects: | |
Online Access: | http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.1061.3867 http://www.rizzoassoc.com/cms/images/stories/site/published_papers/construction_dewatering_saluda.doc.pdf |
id |
ftciteseerx:oai:CiteSeerX.psu:10.1.1.1061.3867 |
---|---|
record_format |
openpolar |
spelling |
ftciteseerx:oai:CiteSeerX.psu:10.1.1.1061.3867 2023-05-15T17:08:23+02:00 CONSTRUCTION DEWATERING AT SALUDA DAM; DESIGN, TESTING, AND IMPLEMENTATION John P Osterle Paul C Rizzo P E William Argentieri Jeffrey D Holchin The Pennsylvania State University CiteSeerX Archives application/pdf http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.1061.3867 http://www.rizzoassoc.com/cms/images/stories/site/published_papers/construction_dewatering_saluda.doc.pdf en eng http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.1061.3867 http://www.rizzoassoc.com/cms/images/stories/site/published_papers/construction_dewatering_saluda.doc.pdf Metadata may be used without restrictions as long as the oai identifier remains attached to it. http://www.rizzoassoc.com/cms/images/stories/site/published_papers/construction_dewatering_saluda.doc.pdf text ftciteseerx 2020-04-19T00:20:02Z ABSTRACT The proposed Remediation of Saluda Dam, located approximately ten miles to the west of Columbia South Carolina and owned and operated by South Carolina Electric & Gas Company (SCE&G), consists of a 5,500-foot-long Rock Fill Berm and a 2,200-foot-long Roller Compacted Concrete (RCC) Berm. This combination RCC and Rockfill Berm will be constructed along the downstream toe of the existing 200-foot-high earth embankment dam. Should the existing Dam fail during a seismic event, the combination Rockfill and RCC Berm will serve as a backup dam to prevent an uncontrolled release of Lake Murray. Extensive foundation excavations into the residual soil or to bedrock at the toe of the existing Dam are required to facilitate the construction of the RCC and Rockfill Berm. To maintain an adequate factor of safety against slope instability for the existing Dam during construction, the existing phreatic surface within the Dam needs to be lowered substantially by dewatering. Based on the hydrogeologic conditions at the site, Paul C. Rizzo Associates (RIZZO) determined that the dewatering system should consist primarily of deep wells and eductors. Numerous components of this system that have been installed are currently operating to lower the phreatic surface within the Dam and downstream foundation excavation. Engineering analyses consisting of analytical models and finite element analyses were utilized to estimate the approximate spacing and flow rate required for the deep wells and eductors. Early indications are that the dewatering system will be successful in dewatering the existing Dam so that the construction can proceed without delay. Text Long Rock Unknown Long Rock ENVELOPE(-61.198,-61.198,-62.689,-62.689) The Toe ENVELOPE(-59.167,-59.167,-62.333,-62.333) |
institution |
Open Polar |
collection |
Unknown |
op_collection_id |
ftciteseerx |
language |
English |
description |
ABSTRACT The proposed Remediation of Saluda Dam, located approximately ten miles to the west of Columbia South Carolina and owned and operated by South Carolina Electric & Gas Company (SCE&G), consists of a 5,500-foot-long Rock Fill Berm and a 2,200-foot-long Roller Compacted Concrete (RCC) Berm. This combination RCC and Rockfill Berm will be constructed along the downstream toe of the existing 200-foot-high earth embankment dam. Should the existing Dam fail during a seismic event, the combination Rockfill and RCC Berm will serve as a backup dam to prevent an uncontrolled release of Lake Murray. Extensive foundation excavations into the residual soil or to bedrock at the toe of the existing Dam are required to facilitate the construction of the RCC and Rockfill Berm. To maintain an adequate factor of safety against slope instability for the existing Dam during construction, the existing phreatic surface within the Dam needs to be lowered substantially by dewatering. Based on the hydrogeologic conditions at the site, Paul C. Rizzo Associates (RIZZO) determined that the dewatering system should consist primarily of deep wells and eductors. Numerous components of this system that have been installed are currently operating to lower the phreatic surface within the Dam and downstream foundation excavation. Engineering analyses consisting of analytical models and finite element analyses were utilized to estimate the approximate spacing and flow rate required for the deep wells and eductors. Early indications are that the dewatering system will be successful in dewatering the existing Dam so that the construction can proceed without delay. |
author2 |
The Pennsylvania State University CiteSeerX Archives |
format |
Text |
author |
John P Osterle Paul C Rizzo P E William Argentieri Jeffrey D Holchin |
spellingShingle |
John P Osterle Paul C Rizzo P E William Argentieri Jeffrey D Holchin CONSTRUCTION DEWATERING AT SALUDA DAM; DESIGN, TESTING, AND IMPLEMENTATION |
author_facet |
John P Osterle Paul C Rizzo P E William Argentieri Jeffrey D Holchin |
author_sort |
John P Osterle |
title |
CONSTRUCTION DEWATERING AT SALUDA DAM; DESIGN, TESTING, AND IMPLEMENTATION |
title_short |
CONSTRUCTION DEWATERING AT SALUDA DAM; DESIGN, TESTING, AND IMPLEMENTATION |
title_full |
CONSTRUCTION DEWATERING AT SALUDA DAM; DESIGN, TESTING, AND IMPLEMENTATION |
title_fullStr |
CONSTRUCTION DEWATERING AT SALUDA DAM; DESIGN, TESTING, AND IMPLEMENTATION |
title_full_unstemmed |
CONSTRUCTION DEWATERING AT SALUDA DAM; DESIGN, TESTING, AND IMPLEMENTATION |
title_sort |
construction dewatering at saluda dam; design, testing, and implementation |
url |
http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.1061.3867 http://www.rizzoassoc.com/cms/images/stories/site/published_papers/construction_dewatering_saluda.doc.pdf |
long_lat |
ENVELOPE(-61.198,-61.198,-62.689,-62.689) ENVELOPE(-59.167,-59.167,-62.333,-62.333) |
geographic |
Long Rock The Toe |
geographic_facet |
Long Rock The Toe |
genre |
Long Rock |
genre_facet |
Long Rock |
op_source |
http://www.rizzoassoc.com/cms/images/stories/site/published_papers/construction_dewatering_saluda.doc.pdf |
op_relation |
http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.1061.3867 http://www.rizzoassoc.com/cms/images/stories/site/published_papers/construction_dewatering_saluda.doc.pdf |
op_rights |
Metadata may be used without restrictions as long as the oai identifier remains attached to it. |
_version_ |
1766064118721150976 |