Offshore Wind Turbine Installation Vessels - A Comparative Study between the Flex Offshore Barge and the Pacific Orca

Although wind power's history dates back to the mid-1900s, one of the major breakthroughs came in the 1990s, when the industry began to move the turbines offshore. Even though installation costs are higher offshore, many energy companies began to realise the implications of the good wind condit...

Full description

Bibliographic Details
Main Authors: Thalén, Jonathan, Johansson, Adam
Format: Other/Unknown Material
Language:English
Published: Chalmers tekniska högskola / Institutionen för sjöfart och marin teknik 2013
Subjects:
Online Access:https://hdl.handle.net/20.500.12380/179959
_version_ 1830572987378565120
author Thalén, Jonathan
Johansson, Adam
author_facet Thalén, Jonathan
Johansson, Adam
author_sort Thalén, Jonathan
collection Chalmers University of Technology: Chalmers Open Digital Repository (ODR)
description Although wind power's history dates back to the mid-1900s, one of the major breakthroughs came in the 1990s, when the industry began to move the turbines offshore. Even though installation costs are higher offshore, many energy companies began to realise the implications of the good wind conditions and expansion opportunities that the sea offers. In Europe alone, there were a total of 1662 wind turbines installed and connected by the end of 2011 and the outlook is good for further development with 14 ongoing wind farm projects at the start of 2013. With the expansion rate increasing, the pressure increases on energy companies to develop better and faster solutions for the offshore installation. The purpose of this report is to examine a new type of installation vessel, currently under development, the Flex offshore Barge (FOB).The FOB will use a new method to install the turbines, where the turbine is assembled on land and then transported out to the wind turbine field and lowered into the water. This represents a major difference from the so-called jack-up vessels used today, which transport the turbine in parts and then install the turbine on site. Because of the large difference, the FOB will be compared to one of the largest jack-up vessels on the market, the Pacific Orca, on a time and cost basis. The information for this report was collected through interviews with the developers of the FOB and other persons who are active in the wind power industry. The goal has been to acquire key figures in the context of time and money that constitutes the basis for the comparison between the ships. Key figures that could not be collected through interviews have instead been retrieved from scientific reports or assumed by the authors. In summary, the FOB is a faster alternative to the jack-up vessels, but there remains a lot of work and there are many obstacles that must be overcome for the system to work out the right way. Many of the ships' systems must be tested in real life before it is possible to determine how ...
format Other/Unknown Material
genre Orca
genre_facet Orca
geographic Pacific
geographic_facet Pacific
id ftchalmersuniojs:oai:odr.chalmers.se:20.500.12380/179959
institution Open Polar
language English
op_collection_id ftchalmersuniojs
op_doi https://doi.org/20.500.12380/179959
op_relation https://hdl.handle.net/20.500.12380/179959
publishDate 2013
publisher Chalmers tekniska högskola / Institutionen för sjöfart och marin teknik
record_format openpolar
spelling ftchalmersuniojs:oai:odr.chalmers.se:20.500.12380/179959 2025-04-27T14:34:25+00:00 Offshore Wind Turbine Installation Vessels - A Comparative Study between the Flex Offshore Barge and the Pacific Orca Thalén, Jonathan Johansson, Adam 2013 https://hdl.handle.net/20.500.12380/179959 eng eng Chalmers tekniska högskola / Institutionen för sjöfart och marin teknik https://hdl.handle.net/20.500.12380/179959 Energi Miljöteknik Hållbar utveckling Marin teknik Building Futures Energy Environmental engineering Sustainable Development Marine Engineering M2 2013 ftchalmersuniojs https://doi.org/20.500.12380/179959 2025-04-02T03:21:02Z Although wind power's history dates back to the mid-1900s, one of the major breakthroughs came in the 1990s, when the industry began to move the turbines offshore. Even though installation costs are higher offshore, many energy companies began to realise the implications of the good wind conditions and expansion opportunities that the sea offers. In Europe alone, there were a total of 1662 wind turbines installed and connected by the end of 2011 and the outlook is good for further development with 14 ongoing wind farm projects at the start of 2013. With the expansion rate increasing, the pressure increases on energy companies to develop better and faster solutions for the offshore installation. The purpose of this report is to examine a new type of installation vessel, currently under development, the Flex offshore Barge (FOB).The FOB will use a new method to install the turbines, where the turbine is assembled on land and then transported out to the wind turbine field and lowered into the water. This represents a major difference from the so-called jack-up vessels used today, which transport the turbine in parts and then install the turbine on site. Because of the large difference, the FOB will be compared to one of the largest jack-up vessels on the market, the Pacific Orca, on a time and cost basis. The information for this report was collected through interviews with the developers of the FOB and other persons who are active in the wind power industry. The goal has been to acquire key figures in the context of time and money that constitutes the basis for the comparison between the ships. Key figures that could not be collected through interviews have instead been retrieved from scientific reports or assumed by the authors. In summary, the FOB is a faster alternative to the jack-up vessels, but there remains a lot of work and there are many obstacles that must be overcome for the system to work out the right way. Many of the ships' systems must be tested in real life before it is possible to determine how ... Other/Unknown Material Orca Chalmers University of Technology: Chalmers Open Digital Repository (ODR) Pacific
spellingShingle Energi
Miljöteknik
Hållbar utveckling
Marin teknik
Building Futures
Energy
Environmental engineering
Sustainable Development
Marine Engineering
Thalén, Jonathan
Johansson, Adam
Offshore Wind Turbine Installation Vessels - A Comparative Study between the Flex Offshore Barge and the Pacific Orca
title Offshore Wind Turbine Installation Vessels - A Comparative Study between the Flex Offshore Barge and the Pacific Orca
title_full Offshore Wind Turbine Installation Vessels - A Comparative Study between the Flex Offshore Barge and the Pacific Orca
title_fullStr Offshore Wind Turbine Installation Vessels - A Comparative Study between the Flex Offshore Barge and the Pacific Orca
title_full_unstemmed Offshore Wind Turbine Installation Vessels - A Comparative Study between the Flex Offshore Barge and the Pacific Orca
title_short Offshore Wind Turbine Installation Vessels - A Comparative Study between the Flex Offshore Barge and the Pacific Orca
title_sort offshore wind turbine installation vessels - a comparative study between the flex offshore barge and the pacific orca
topic Energi
Miljöteknik
Hållbar utveckling
Marin teknik
Building Futures
Energy
Environmental engineering
Sustainable Development
Marine Engineering
topic_facet Energi
Miljöteknik
Hållbar utveckling
Marin teknik
Building Futures
Energy
Environmental engineering
Sustainable Development
Marine Engineering
url https://hdl.handle.net/20.500.12380/179959