Preliminary Assessment of Dempster Highway permafrost conditions: Mapping to inform the design bases for fibre optic cable installation

In cold climates such as central and northern Yukon, construction at a site must account for permafrost characteristics and implement design adaptations to ensure the resilience of the infrastructure, or risk costly repairs and interruption to services. The proposed fibre optic link from Inuvik to D...

Full description

Bibliographic Details
Other Authors: McKillop, Robin (Author), Sacco, Dave (Author), Roy, Louis-Philippe (Author), Calmels, Fabrice (Author), Benkert, Bronwyn (Author), Horton, Brian (Author), Brown, Courtenay (Author)
Format: Article in Journal/Newspaper
Language:unknown
Published: Yukon Research Centre 2016
Subjects:
Online Access:https://arcabc.ca/islandora/object/yukonu%3A32
id ftarcabc:oai:arcabc.ca:yukonu_32
record_format openpolar
spelling ftarcabc:oai:arcabc.ca:yukonu_32 2024-06-02T08:05:43+00:00 Preliminary Assessment of Dempster Highway permafrost conditions: Mapping to inform the design bases for fibre optic cable installation McKillop, Robin (Author) Sacco, Dave (Author) Roy, Louis-Philippe (Author) Calmels, Fabrice (Author) Benkert, Bronwyn (Author) Horton, Brian (Author) Brown, Courtenay (Author) 2016 https://arcabc.ca/islandora/object/yukonu%3A32 unknown Yukon Research Centre https://arcabc.ca/islandora/object/yukonu%3A32 yukonu:32 http://rightsstatements.org/vocab/InC/1.0/ publisher Fiber optic cables Frost heaving Permafrost article Text 2016 ftarcabc 2024-05-06T00:30:44Z In cold climates such as central and northern Yukon, construction at a site must account for permafrost characteristics and implement design adaptations to ensure the resilience of the infrastructure, or risk costly repairs and interruption to services. The proposed fibre optic link from Inuvik to Dawson City will cross a vast area of permafrost. The challenges associated with construction of this line will be compounded because the cable is buried and because the infrastructure crosses hundreds of kilometres of terrain where there is little known about the nature of the permafrost. Existing highway infrastructure in the region is already affected by permafrost degradation. Article in Journal/Newspaper Dawson Inuvik permafrost Yukon Arca (BC's Digital Treasures) Dawson City ENVELOPE(-139.433,-139.433,64.060,64.060) Inuvik ENVELOPE(-133.610,-133.610,68.341,68.341) Yukon
institution Open Polar
collection Arca (BC's Digital Treasures)
op_collection_id ftarcabc
language unknown
topic Fiber optic cables
Frost heaving
Permafrost
spellingShingle Fiber optic cables
Frost heaving
Permafrost
Preliminary Assessment of Dempster Highway permafrost conditions: Mapping to inform the design bases for fibre optic cable installation
topic_facet Fiber optic cables
Frost heaving
Permafrost
description In cold climates such as central and northern Yukon, construction at a site must account for permafrost characteristics and implement design adaptations to ensure the resilience of the infrastructure, or risk costly repairs and interruption to services. The proposed fibre optic link from Inuvik to Dawson City will cross a vast area of permafrost. The challenges associated with construction of this line will be compounded because the cable is buried and because the infrastructure crosses hundreds of kilometres of terrain where there is little known about the nature of the permafrost. Existing highway infrastructure in the region is already affected by permafrost degradation.
author2 McKillop, Robin (Author)
Sacco, Dave (Author)
Roy, Louis-Philippe (Author)
Calmels, Fabrice (Author)
Benkert, Bronwyn (Author)
Horton, Brian (Author)
Brown, Courtenay (Author)
format Article in Journal/Newspaper
title Preliminary Assessment of Dempster Highway permafrost conditions: Mapping to inform the design bases for fibre optic cable installation
title_short Preliminary Assessment of Dempster Highway permafrost conditions: Mapping to inform the design bases for fibre optic cable installation
title_full Preliminary Assessment of Dempster Highway permafrost conditions: Mapping to inform the design bases for fibre optic cable installation
title_fullStr Preliminary Assessment of Dempster Highway permafrost conditions: Mapping to inform the design bases for fibre optic cable installation
title_full_unstemmed Preliminary Assessment of Dempster Highway permafrost conditions: Mapping to inform the design bases for fibre optic cable installation
title_sort preliminary assessment of dempster highway permafrost conditions: mapping to inform the design bases for fibre optic cable installation
publisher Yukon Research Centre
publishDate 2016
url https://arcabc.ca/islandora/object/yukonu%3A32
long_lat ENVELOPE(-139.433,-139.433,64.060,64.060)
ENVELOPE(-133.610,-133.610,68.341,68.341)
geographic Dawson City
Inuvik
Yukon
geographic_facet Dawson City
Inuvik
Yukon
genre Dawson
Inuvik
permafrost
Yukon
genre_facet Dawson
Inuvik
permafrost
Yukon
op_relation https://arcabc.ca/islandora/object/yukonu%3A32
yukonu:32
op_rights http://rightsstatements.org/vocab/InC/1.0/
publisher
_version_ 1800750586954514432