Unit rate contracts: is it a model for oil sands projects?
This project will investigate strategies that help provide cost surety to the oil sands construction industries. The project will begin with a review of the historical cost overruns and the lessons learned. The next focus point will be reviewing the demographics of Wood Buffalo to demonstrate the ch...
Other Authors: | , , |
---|---|
Format: | Text |
Language: | English |
Published: |
University of Northern British Columbia
2014
|
Subjects: | |
Online Access: | https://arcabc.ca/islandora/object/unbc%3A15478 https://doi.org/10.24124/2014/bpgub1650 |
id |
ftarcabc:oai:arcabc.ca:unbc_15478 |
---|---|
record_format |
openpolar |
spelling |
ftarcabc:oai:arcabc.ca:unbc_15478 2024-06-02T08:15:49+00:00 Unit rate contracts: is it a model for oil sands projects? Hibbitts, Patrick Anthony (Author) Cox, Raymond (Thesis advisor) University of Northern British Columbia (Degree granting institution) 2014 electronic Number of pages in document: 55 https://arcabc.ca/islandora/object/unbc%3A15478 https://doi.org/10.24124/2014/bpgub1650 English eng University of Northern British Columbia https://arcabc.ca/islandora/object/unbc%3A15478 uuid: d476474e-1122-41cb-b341-a29f8f8047fe bib-number: b1953316 https://doi.org/10.24124/2014/bpgub1650 lac: TC-BPGUB-1650 Copyright retained by the author. http://rightsstatements.org/vocab/InC/1.0/ Oil sands industry -- Alberta -- Cost control Oil sands -- Alberta -- Cost of operation TN873.C2 H53 2014 Text research (documents) 2014 ftarcabc https://doi.org/10.24124/2014/bpgub1650 2024-05-06T00:30:44Z This project will investigate strategies that help provide cost surety to the oil sands construction industries. The project will begin with a review of the historical cost overruns and the lessons learned. The next focus point will be reviewing the demographics of Wood Buffalo to demonstrate the changes that have occurred since the early 2000s and refute the labour availability claim. Following the demographic review we will review construction contracts and the use of good faith as a contractual term. We will then conclude with a review of a unit rate simulation and discussion. --Leaves 2-3. The original print copy of this thesis may be available here: http://wizard.unbc.ca/record=b1953316 Text Wood Buffalo Arca (BC's Digital Treasures) Wood Buffalo ENVELOPE(-112.007,-112.007,57.664,57.664) |
institution |
Open Polar |
collection |
Arca (BC's Digital Treasures) |
op_collection_id |
ftarcabc |
language |
English |
topic |
Oil sands industry -- Alberta -- Cost control Oil sands -- Alberta -- Cost of operation TN873.C2 H53 2014 |
spellingShingle |
Oil sands industry -- Alberta -- Cost control Oil sands -- Alberta -- Cost of operation TN873.C2 H53 2014 Unit rate contracts: is it a model for oil sands projects? |
topic_facet |
Oil sands industry -- Alberta -- Cost control Oil sands -- Alberta -- Cost of operation TN873.C2 H53 2014 |
description |
This project will investigate strategies that help provide cost surety to the oil sands construction industries. The project will begin with a review of the historical cost overruns and the lessons learned. The next focus point will be reviewing the demographics of Wood Buffalo to demonstrate the changes that have occurred since the early 2000s and refute the labour availability claim. Following the demographic review we will review construction contracts and the use of good faith as a contractual term. We will then conclude with a review of a unit rate simulation and discussion. --Leaves 2-3. The original print copy of this thesis may be available here: http://wizard.unbc.ca/record=b1953316 |
author2 |
Hibbitts, Patrick Anthony (Author) Cox, Raymond (Thesis advisor) University of Northern British Columbia (Degree granting institution) |
format |
Text |
title |
Unit rate contracts: is it a model for oil sands projects? |
title_short |
Unit rate contracts: is it a model for oil sands projects? |
title_full |
Unit rate contracts: is it a model for oil sands projects? |
title_fullStr |
Unit rate contracts: is it a model for oil sands projects? |
title_full_unstemmed |
Unit rate contracts: is it a model for oil sands projects? |
title_sort |
unit rate contracts: is it a model for oil sands projects? |
publisher |
University of Northern British Columbia |
publishDate |
2014 |
url |
https://arcabc.ca/islandora/object/unbc%3A15478 https://doi.org/10.24124/2014/bpgub1650 |
long_lat |
ENVELOPE(-112.007,-112.007,57.664,57.664) |
geographic |
Wood Buffalo |
geographic_facet |
Wood Buffalo |
genre |
Wood Buffalo |
genre_facet |
Wood Buffalo |
op_relation |
https://arcabc.ca/islandora/object/unbc%3A15478 uuid: d476474e-1122-41cb-b341-a29f8f8047fe bib-number: b1953316 https://doi.org/10.24124/2014/bpgub1650 lac: TC-BPGUB-1650 |
op_rights |
Copyright retained by the author. http://rightsstatements.org/vocab/InC/1.0/ |
op_doi |
https://doi.org/10.24124/2014/bpgub1650 |
_version_ |
1800740113236361216 |