Tracer test results and particle size analysis of Lower Permeable Reactive Barrier (PRB), Main Powerhouse site, Casey Station.

A permeable reactive barrier (PRB) was installed downgradient of the Main Powerhouse at Casey Station in 2005 in order to contain and treat fuel contaminated water arising from a fuel spill that occurred in the area in 1999. The PRB consists of a funnel and gate system with 5 "cages" conta...

Full description

Bibliographic Details
Other Authors: MUMFORD, KATHRYN ANNE (hasPrincipalInvestigator), MUMFORD, KATHRYN ANNE (processor), RAYNER, JOHN LENDON (hasPrincipalInvestigator), RAYNER, JOHN LENDON (processor), SPEDDING, TIM (hasPrincipalInvestigator), SPEDDING, TIM (processor), STATHAM, TOM (processor), Australian Antarctic Data Centre (publisher)
Format: Dataset
Language:unknown
Published: Australian Antarctic Data Centre
Subjects:
PRB
Online Access:https://researchdata.ands.org.au/tracer-test-results-casey-station/698970
https://doi.org/10.4225/15/55075E7121113
https://data.aad.gov.au/metadata/records/AAS_4029_Tracer_Particle
http://nla.gov.au/nla.party-617536