Iceland Academy of Arts, Reykjavik Renovation and extension of an empty meat packing facility

Icelandic Academy of the Arts (IAA) consists of five departments: the department of art education, department of design and architecture, department of fine arts, department of music and the department of theatre and dance. According to IAA agenda and curriculum all the departments shall maintain cl...

Full description

Bibliographic Details
Main Author: Jónsson, Jóhann Einar
Other Authors: Insinööritieteiden korkeakoulu, School of Engineering, Arkkitehtuurin laitos, Siikala, Antti-Matti, Aalto-yliopisto, Aalto University
Format: Master Thesis
Language:English
Published: 2010
Subjects:
Online Access:https://aaltodoc.aalto.fi/handle/123456789/98180
id ftaaltouniv:oai:aaltodoc.aalto.fi:123456789/98180
record_format openpolar
spelling ftaaltouniv:oai:aaltodoc.aalto.fi:123456789/98180 2023-05-15T16:49:43+02:00 Iceland Academy of Arts, Reykjavik Renovation and extension of an empty meat packing facility Islannin taideakatemia, Reykjavik Tyhjän lihajalostamon peruskorjaus ja laajennus Jónsson, Jóhann Einar Insinööritieteiden korkeakoulu School of Engineering Arkkitehtuurin laitos Siikala, Antti-Matti Aalto-yliopisto Aalto University 2010 https://aaltodoc.aalto.fi/handle/123456789/98180 en eng https://aaltodoc.aalto.fi/handle/123456789/98180 URN:NBN:fi:aalto-2020122357007 closedAccess Iceland Reykjavik arts academy renovation extension urban regeneration Islanti taideakatemia peruskorjaus laajennus kaupungin uudistaminen Master's thesis Pro gradu -tutkielma masterThesis G2 Pro gradu, diplomityö 2010 ftaaltouniv 2022-12-15T19:31:13Z Icelandic Academy of the Arts (IAA) consists of five departments: the department of art education, department of design and architecture, department of fine arts, department of music and the department of theatre and dance. According to IAA agenda and curriculum all the departments shall maintain close cooperation. Currently IAA is operated on three different locations in Reykjavik. This limits the possibilities for collaboration and leads to higher running costs. In 2008 IAA managed to acquire a building site on Laugavegur, the main shopping street of downtown Reykjavik. A two stage architectural competition for new building was held but the economic crash in autumn 2008 put all the plans on hold. This project deals with how to fit the room program from the competition to an empty meat production factory from 1988. Renovation and extension of the building is required. Currently the fine arts department of IAA is located in the basement of the building but the rest is unused. However, as the building stands on a prominent site by the coastline on the fringe of the city centre area, after being renovated it could become the centrepiece of regeneration of the area. The tectonic rhythm of the existing building controls the possible interventions. In the design, precast roof elements are removed from the central space of the building and a cut is made in the basement roof slab to create connection between floors and let more daylight in. New building with concrete skeleton is erected to the west and north of the existing one and finally steel structure is put on top of the existing building and new building to create the 3rd floor. The material palette of the project seeks to strike a balance between the neighbouring residential buildings and close by industrial ones. Aluminium cladding of the existing structure is remade and the new structure is clad with sandblasted Reglit glass elements. Quantative information on the project:. Number of floors: Basement + 3 floors. Total floor area gross:19.846m2 (9.760m2 old ... Master Thesis Iceland Aalto University Publication Archive (Aaltodoc)
institution Open Polar
collection Aalto University Publication Archive (Aaltodoc)
op_collection_id ftaaltouniv
language English
topic Iceland
Reykjavik
arts academy
renovation
extension
urban regeneration
Islanti
taideakatemia
peruskorjaus
laajennus
kaupungin uudistaminen
spellingShingle Iceland
Reykjavik
arts academy
renovation
extension
urban regeneration
Islanti
taideakatemia
peruskorjaus
laajennus
kaupungin uudistaminen
Jónsson, Jóhann Einar
Iceland Academy of Arts, Reykjavik Renovation and extension of an empty meat packing facility
topic_facet Iceland
Reykjavik
arts academy
renovation
extension
urban regeneration
Islanti
taideakatemia
peruskorjaus
laajennus
kaupungin uudistaminen
description Icelandic Academy of the Arts (IAA) consists of five departments: the department of art education, department of design and architecture, department of fine arts, department of music and the department of theatre and dance. According to IAA agenda and curriculum all the departments shall maintain close cooperation. Currently IAA is operated on three different locations in Reykjavik. This limits the possibilities for collaboration and leads to higher running costs. In 2008 IAA managed to acquire a building site on Laugavegur, the main shopping street of downtown Reykjavik. A two stage architectural competition for new building was held but the economic crash in autumn 2008 put all the plans on hold. This project deals with how to fit the room program from the competition to an empty meat production factory from 1988. Renovation and extension of the building is required. Currently the fine arts department of IAA is located in the basement of the building but the rest is unused. However, as the building stands on a prominent site by the coastline on the fringe of the city centre area, after being renovated it could become the centrepiece of regeneration of the area. The tectonic rhythm of the existing building controls the possible interventions. In the design, precast roof elements are removed from the central space of the building and a cut is made in the basement roof slab to create connection between floors and let more daylight in. New building with concrete skeleton is erected to the west and north of the existing one and finally steel structure is put on top of the existing building and new building to create the 3rd floor. The material palette of the project seeks to strike a balance between the neighbouring residential buildings and close by industrial ones. Aluminium cladding of the existing structure is remade and the new structure is clad with sandblasted Reglit glass elements. Quantative information on the project:. Number of floors: Basement + 3 floors. Total floor area gross:19.846m2 (9.760m2 old ...
author2 Insinööritieteiden korkeakoulu
School of Engineering
Arkkitehtuurin laitos
Siikala, Antti-Matti
Aalto-yliopisto
Aalto University
format Master Thesis
author Jónsson, Jóhann Einar
author_facet Jónsson, Jóhann Einar
author_sort Jónsson, Jóhann Einar
title Iceland Academy of Arts, Reykjavik Renovation and extension of an empty meat packing facility
title_short Iceland Academy of Arts, Reykjavik Renovation and extension of an empty meat packing facility
title_full Iceland Academy of Arts, Reykjavik Renovation and extension of an empty meat packing facility
title_fullStr Iceland Academy of Arts, Reykjavik Renovation and extension of an empty meat packing facility
title_full_unstemmed Iceland Academy of Arts, Reykjavik Renovation and extension of an empty meat packing facility
title_sort iceland academy of arts, reykjavik renovation and extension of an empty meat packing facility
publishDate 2010
url https://aaltodoc.aalto.fi/handle/123456789/98180
genre Iceland
genre_facet Iceland
op_relation https://aaltodoc.aalto.fi/handle/123456789/98180
URN:NBN:fi:aalto-2020122357007
op_rights closedAccess
_version_ 1766039909588533248