News: Geomechanics and Tunnelling 1/2019
Abstract Full upgrading of the Klaus tunnel chain completed – Vollausbau der Tunnelkette Klaus abgeschlossen Two new EPB machines for the Istanbul Metro – Zwei neue EPB‐Maschinen für die Metro Istanbul Three main construction contracts for the 2nd main line in Munich awarded – Drei Hauptbaulose für...
Published in: | Geomechanics and Tunnelling |
---|---|
Format: | Article in Journal/Newspaper |
Language: | English |
Published: |
Wiley
2019
|
Subjects: | |
Online Access: | http://dx.doi.org/10.1002/geot.201970104 https://api.wiley.com/onlinelibrary/tdm/v1/articles/10.1002%2Fgeot.201970104 https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.201970104 |
id |
crwiley:10.1002/geot.201970104 |
---|---|
record_format |
openpolar |
spelling |
crwiley:10.1002/geot.201970104 2024-06-02T08:11:49+00:00 News: Geomechanics and Tunnelling 1/2019 2019 http://dx.doi.org/10.1002/geot.201970104 https://api.wiley.com/onlinelibrary/tdm/v1/articles/10.1002%2Fgeot.201970104 https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.201970104 en eng Wiley http://onlinelibrary.wiley.com/termsAndConditions#vor Geomechanics and Tunnelling volume 12, issue 1, page 4-14 ISSN 1865-7362 1865-7389 journal-article 2019 crwiley https://doi.org/10.1002/geot.201970104 2024-05-03T11:33:40Z Abstract Full upgrading of the Klaus tunnel chain completed – Vollausbau der Tunnelkette Klaus abgeschlossen Two new EPB machines for the Istanbul Metro – Zwei neue EPB‐Maschinen für die Metro Istanbul Three main construction contracts for the 2nd main line in Munich awarded – Drei Hauptbaulose für die 2. Stammstrecke in München vergeben Contract for the Rudersdorf Tunnel awarded – Auftrag für Tunnel Rudersdorf vergeben DB completes investigation drilling for the Brenner north approach in the Inntal – Bahn schließt Erkundungsbohrungen für den Brenner‐Nordzulauf im Inntal ab 14 km Tunnel to improve electricity supply in Stockholm – 14‐km ‐Tunnel für den Ausbau der Stockholmer Energieversorgung Gallery for the Argenbach small hydropower station awarded – Stollen für Kleinwasserkraftwerk Argenbach beauftragt Slate: rock of the year 2019 – Schiefer: Gestein des Jahres 2019 Skanska to build tunnel in north Norway – Skanska baut Tunnel in Nord‐Norwegen WTC 2019: Technology and innovation meet archaeology, architecture and art – WTC 2019: Technik und Innovation treffen Archäologie, Architektur und Kunst Call for papers – Themes for the next issues of Geomechanics and Tunnelling – Themen für die nächsten Ausgaben der „Geomechanics and Tunnelling” Article in Journal/Newspaper North Norway Wiley Online Library Klaus ENVELOPE(24.117,24.117,65.717,65.717) Norway Geomechanics and Tunnelling 12 1 4 14 |
institution |
Open Polar |
collection |
Wiley Online Library |
op_collection_id |
crwiley |
language |
English |
description |
Abstract Full upgrading of the Klaus tunnel chain completed – Vollausbau der Tunnelkette Klaus abgeschlossen Two new EPB machines for the Istanbul Metro – Zwei neue EPB‐Maschinen für die Metro Istanbul Three main construction contracts for the 2nd main line in Munich awarded – Drei Hauptbaulose für die 2. Stammstrecke in München vergeben Contract for the Rudersdorf Tunnel awarded – Auftrag für Tunnel Rudersdorf vergeben DB completes investigation drilling for the Brenner north approach in the Inntal – Bahn schließt Erkundungsbohrungen für den Brenner‐Nordzulauf im Inntal ab 14 km Tunnel to improve electricity supply in Stockholm – 14‐km ‐Tunnel für den Ausbau der Stockholmer Energieversorgung Gallery for the Argenbach small hydropower station awarded – Stollen für Kleinwasserkraftwerk Argenbach beauftragt Slate: rock of the year 2019 – Schiefer: Gestein des Jahres 2019 Skanska to build tunnel in north Norway – Skanska baut Tunnel in Nord‐Norwegen WTC 2019: Technology and innovation meet archaeology, architecture and art – WTC 2019: Technik und Innovation treffen Archäologie, Architektur und Kunst Call for papers – Themes for the next issues of Geomechanics and Tunnelling – Themen für die nächsten Ausgaben der „Geomechanics and Tunnelling” |
format |
Article in Journal/Newspaper |
title |
News: Geomechanics and Tunnelling 1/2019 |
spellingShingle |
News: Geomechanics and Tunnelling 1/2019 |
title_short |
News: Geomechanics and Tunnelling 1/2019 |
title_full |
News: Geomechanics and Tunnelling 1/2019 |
title_fullStr |
News: Geomechanics and Tunnelling 1/2019 |
title_full_unstemmed |
News: Geomechanics and Tunnelling 1/2019 |
title_sort |
news: geomechanics and tunnelling 1/2019 |
publisher |
Wiley |
publishDate |
2019 |
url |
http://dx.doi.org/10.1002/geot.201970104 https://api.wiley.com/onlinelibrary/tdm/v1/articles/10.1002%2Fgeot.201970104 https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.201970104 |
long_lat |
ENVELOPE(24.117,24.117,65.717,65.717) |
geographic |
Klaus Norway |
geographic_facet |
Klaus Norway |
genre |
North Norway |
genre_facet |
North Norway |
op_source |
Geomechanics and Tunnelling volume 12, issue 1, page 4-14 ISSN 1865-7362 1865-7389 |
op_rights |
http://onlinelibrary.wiley.com/termsAndConditions#vor |
op_doi |
https://doi.org/10.1002/geot.201970104 |
container_title |
Geomechanics and Tunnelling |
container_volume |
12 |
container_issue |
1 |
container_start_page |
4 |
op_container_end_page |
14 |
_version_ |
1800758091856216064 |