Demolition of a 65‐year‐old box‐girder prestressed concrete bridge located in Northern Sweden

Abstract A new bridge was built in Kalix, northern Sweden, to replace an existing prestressed concrete box‐girder bridge that had been in service for over 60 years. The old bridge had a total length of 283.6 m divided into five spans: 43.9 m, 47.0 m, 94.0 m, 47.0 m, and 43.9 m. It was constructed us...

Full description

Bibliographic Details
Published in:ce/papers
Main Authors: Daescu, Cosmin Al, Gonzalez‐Libreros, Jaime, Wang, Chao, Elfgren, Lennart, Sas, Gabriel
Format: Article in Journal/Newspaper
Language:English
Published: Wiley 2023
Subjects:
Online Access:http://dx.doi.org/10.1002/cepa.2745
https://onlinelibrary.wiley.com/doi/pdf/10.1002/cepa.2745