The Claim for a first insight of Vikram Lander on moon

The Claim for a First insight of Viram Lander on Moon.CHANDRAYAAN- 2 is the second lunar exploration mission developed by the Indian Space Research Organisation (ISRO), after Chandrayaan-1. As of September 2019, it consists of a lunar orbiter, which included the Vikram lander, andPragyan -the lunar...

Full description

Bibliographic Details
Main Author: saxena, jagmohan
Format: Other/Unknown Material
Language:unknown
Published: Center for Open Science 2020
Subjects:
Online Access:http://dx.doi.org/10.31219/osf.io/xdnh7
Description
Summary:The Claim for a First insight of Viram Lander on Moon.CHANDRAYAAN- 2 is the second lunar exploration mission developed by the Indian Space Research Organisation (ISRO), after Chandrayaan-1. As of September 2019, it consists of a lunar orbiter, which included the Vikram lander, andPragyan -the lunar rover. All of which were developed in India. The main scientific objective of this mission was to map and study the variations in lunar surface composition, as well as the location and abundance of lunar water.Chandrayaan-2 Chandrayaan-2 composite (Tecnical Specifications Mission type-Lunar orbiter, Lander and RoverOperator Indian Space Research Organisation (ISRO)COSPAR ID2019-042ASATCAT no.44441Websitewww.isro.gov.in/chandrayaan2-home-0Mission duration-Orbiter: ~ 7 yearsVikram lander: 14 days (planned) ;[1][2]Achieved: 0 days (landing failure)Pragyan rover: 14 days (planned);[2]Achieved: 0 days (landing failure)Spacecraft properties Manufacturer:Indian Space Research Organisation (ISRO)Launch mass Combined (wet) : 3,850 kg(8,490 lb) [3][4][5]Combined (dry): 1,308 kg (2,884 lb)[6]Orbiter (wet): 2,379 kg (5,245 lb)[4][5]Orbiter (dry): 682 kg (1,504 lb)[6]Vikram lander (wet): 1,471 kg (3,243 lb)[4][5]Vikram lander (dry): 626 kg (1,380 lb)[6]Pragyan rover: 27 kg (60 lb)[4] [5] PowerOrbiter: 1 kW (1.3 hp)[7]Vikram lander: 650 W[8]Pragyan rover: 50 W[8] Start of Mission Launch date:22 July 2019, 14:43:12 IST (09:13:12 UTC)[9]Rocket- GSLV Mark III M1[10] [11]Launch site-Satish Dhawan Space Centre (Second Launch Pad )Agency- Indian Space Research Organisation (ISRO)Moon orbiter Orbital insertion: 20 August 2019, - 09:02 IST(03:32UTC)[12[13]Orbital parameters-Pericynthion altitude100 km (62 mi)[14] Apocynthion altitude100 km (62 mi)[14]Moon lander Space craft component Rover Landing date: 7 September 2019, 01:53 IST (failure)(6 September 2019, 20:23 UTC)[13][15]Landing site Lunar south pole (intended)Chandrayaan programme - Scheduled as-← Chandrayaan-1<-- Chandrayaan-2← Chandrayaan-3 (Under Process) The Chandrayaan-2 ...