La tranchée à boue lourde du barrage OA-11

The OA-11 dam is the most important impounding structure of the Opinaca reservoir created by the water diversion of the Eastmain, Petit Opinaca and Opinaca rivers to the La Grande River to increase the hydroelectric potential of the LG-2 power plant. With a maximum height of 32.2 m and a crest lengt...

Full description

Bibliographic Details
Published in:Canadian Journal of Civil Engineering
Main Authors: Massiéra, Michel, Paré, Jean-Jacques
Format: Article in Journal/Newspaper
Language:English
Published: Canadian Science Publishing 1987
Subjects:
Online Access:http://dx.doi.org/10.1139/l87-123
http://www.nrcresearchpress.com/doi/pdf/10.1139/l87-123